LRT and Transjakarta Connected at Manggarai, KRL Integration Targeted for End of Month
Jakarta Governor Pramono Anung has announced that all Transjakarta stops connected to the LRT Jakarta stations, specifically those at Manggarai Station, will commence operations immediately following the inauguration of the Kelapa Gading-Manggarai LRT line today.
“Therefore, the Transjakarta stops that intersect with the LRT will all be operated immediately, including here. They will be operational perhaps one or two hours after this,” said Pramono in South Jakarta on Wednesday (16/9).
Despite the special fare set for the LRT Jakarta at just Rp8 for the next eight days, Transjakarta fares will remain unchanged.
“Because the only difference is, the LRT is 8 rupiah… Transjakarta remains at Rp3,500,” Pramono added.
Three modes of transport will be interconnected at Manggarai Station, consisting of the LRT, KRL (Commuter Line), and Transjakarta.
However, the President Director of PT Jakarta Propertindo (Jakpro), Iwan Takwin, stated that the connectivity between the LRT at Manggarai Station and the KRL at Manggarai Station is still in the process of being finalised. The integration between these two modes is targeted for completion by the end of September.
“So, we are currently finalising the connection. The connectivity will not only be between the LRT and the KRL, but also with Transjakarta. These three modes will be connected via this route. We hope to finalise everything by the end of this month,” explained Iwan.
Source: jawawa.id (https://jawawa.id/newsitem/lrt-and-transjakarta-connected-at-manggarai-krl-integration-targeted-for-end-of-month-1789597373)
Originally published by CNN Indonesia (https://www.cnnindonesia.com/nasional/20260916191517-20-1404768/lrt-transjakarta-di-manggarai-terhubung-krl-ditargetkan-akhir-bulan), translated from Indonesian