List of Prabowo's Programmes for 2027: Mobnas, Gentengisasi, and Giant Sea Wall
The Ministry of National Development Planning/Bappenas has begun the process of preparing the 2027 Government Work Plan (RKP) as a reference for ministries, institutions, and regions in developing programmes, while also serving as the basis for drafting the 2027 State Budget (RAPBN).
Minister of National Development Planning/Head of Bappenas Rachmat Pambudy emphasised that development must be based on systematic, measurable, and integrated planning and budgeting.
“In development, economic growth is not the ultimate goal but a tool to improve public welfare. Therefore, growth must be inclusive and sustainable,” explained Minister Rachmat Pambudy when opening the Kick Off Meeting of the National Development Planning Consultation (Musrenbangnas) for 2026 online, quoted on Monday (11/5/2026).
The 2027 RKP carries the theme “Accelerating Quality Growth through Productivity, Investment, and Industry”.
In a separate occasion, Rachmat Pambudy explained that the government has set a growth target of 7.5% for next year. This target will be realised through 8 clusters of National Priority Work Programmes (PKPN), accompanied by support from all regions.
“We need to grow, and this growth should not only be in Jakarta but in every region, and in our records, national growth of 5.9% to 7.5% cannot be achieved without regional support,” said Rachmat in the 2026 Rakorbangpus.
Rachmat assured that all priority programmes will be implemented throughout 2027 within three major government focus themes, namely promoting productivity, investment, and industry. They will also be distributed according to the strengths of each region across the Unitary State of the Republic of Indonesia (NKRI).
He also stressed that financing for priority programmes will not only be met through the State Budget (APBN), but will involve non-APBN financing with synergy from all stakeholders.
“Rather, non-APBN financing, including Danantara investments, must be actively encouraged so that our development capacity is not limited to fiscal matters alone,” said Rachmat.
The details of President Prabowo’s programmes for 2027 are as follows:
- FOOD SOVEREIGNTY
5,000 Red and White Fisherman Villages
4,582 Modern Fishing Vessels
40,000 Thematic Inland Fish Farming Locations
Revitalisation of 14,090 Ha Saline Tilapia Ponds in the North Coast
Modelling and Replication of 2,000 Ha Integrated Shrimp Ponds
2,000 Ha National Salt Industry Centre Areas
Development of Integrated Food Areas
Development of Plantation Areas (Palm Oil, Sugarcane, Cocoa, Coconut, Coffee, Cashew, Spices)
Increasing Production of Meat, Milk, and Eggs
- ENERGY AND WATER INDEPENDENCE
Mandatory B50 Biodiesel
Mandatory E20 Bioethanol
100 GW Solar Power Plant (PLTS) Programme
Implementation of Minimum Energy Performance Standards (SKEM)
Conversion of 6 Million Petrol Motorcycles to Electric Motorcycles
Construction of City Gas Networks (Jargas) for 1 Million Household Connections (SR)
Increasing Oil and Gas Lifting
10 Small Scale Green Modular Refineries and 6 Storage (Deployable Mass Model)
Exploration of 10 New Oil and Gas Blocks
Electrification of 10,000 Villages
Waste Management into Electricity Energy (PSEL)
Integrated Large-Scale Hydropower Plants (PLTA)
Electric Stoves for 2-5 Million Households
Optimisation of 45,000 Community Oil Wells
Optimisation of Lifting in 13,824 Old Wells
Water Self-Sufficiency
- EDUCATION
Free Nutritious Meals for School Children
Revitalisation of School/Madrasah Facilities and Infrastructure
School Equipment Assistance
500 Integrated National Schools (SNT)
Teacher Studios
Education Digitalisation (2 Million Interactive Digital Boards)
20 New Garuda Schools, 80 Garuda School Transformations
514 People’s Schools
10 New Universities: STEMM-Based Medical University
500,000 SMK Graduates Go Global
National Sports Academy and National Training Centre
Improving Teacher Welfare, Direct Transfer of Allowances
Child Protection in Digital Spaces through TUNAS Regulation
- HEALTH
Free Nutritious Meals for Pregnant Women, Breastfeeding Mothers, and Toddlers
Upgrade of 86 Hospitals
Free Health Check-Ups
Eradication of Tuberculosis
- DOWNSTREAM PROCESSING AND INDUSTRIALISATION
Downstreaming of Strategic Industries (18 Projects)
National Car (Mobnas)
National Motorcycle
Aerospace Industry Ecosystem
Semiconductor Industry Development
- INFRASTRUCTURE, HOUSING, AND DISASTER RESILIENCE
Giant Sea Wall
Rehabilitation and Reconstruction Post-Sumatra Disaster
ASRI Movement (Gentengisasi, Waste Control, Greening)
3 Million Houses: 1 Million New Houses & 2 Million House Renovations
Development of National Railway Network
- PEOPLE’S ECONOMY AND VILLAGES
80,000 Red and White Village/Urban Village Cooperatives
Acceleration of Development in 3T Regions
- POVERTY REDUCTION
PRO-KESRA Integrated Social Assistance
PRO-KESRA for 10 Million Working and Employed Population