Indonesian Political, Business & Finance News

Legok Nangka PSEL Project Begins Construction, 2,131 Tonnes of Daily Waste to Be Converted into Electricity

| | Source: Republika Translated from Indonesian | Infrastructure
Legok Nangka PSEL Project Begins Construction, 2,131 Tonnes of Daily Waste to Be Converted into Electricity
Image: Republika

The daily waste pile of 2,131 tonnes from six cities and regencies in West Java will enter a new chapter. The construction of the Legok Nangka Waste-to-Energy Plant (PSEL) facility has officially begun, aiming to process this waste into electricity rather than merely stockpiling it at the final disposal site.

The project groundbreaking took place at the Legok Nangka area in Cempakamekar, Padalarang District, West Bandung Regency, on Wednesday, July 29, 2026. Deputy Minister of Energy and Mineral Resources Yuliot Tanjung officiated the ceremony, stating that the comprehensive management of urban waste is a direct instruction from President Prabowo Subianto.

Yuliot explained that the President has instructed for urban waste problems to be resolved thoroughly before 2029 through an upstream-to-downstream scheme, converting waste into an energy source. He noted that unmanaged waste accumulation poses environmental risks such as landslides and fires, making this project a critical solution.

“This groundbreaking is not merely the start of infrastructure construction, but a symbol of our shared commitment to a cleaner, greener, and more sustainable future for Indonesia,” Yuliot said. He expressed hope that the Legok Nangka PSEL would become a model for waste-to-energy projects that can be replicated in other regions.

The project, valued at USD 400 million or approximately IDR 7.2 trillion, is designed with a capacity of 40.79 megawatts. Yuliot detailed that during its 41-month construction period, the project is expected to absorb 1,565 workers and, once operational, will significantly reduce greenhouse gas emissions by an estimated 311,874 tonnes of CO2 equivalent.

More from 30 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/legok-nangka-psel-project-begins-construction-2-131-tonnes-of-daily-waste-to-be-converted-into-electricity-1785387146)
Originally published by Republika (https://ekonomi.republika.co.id/berita/tiz075370/psel-legok-nangka-dibangun-2131-ton-sampah-per-hari-akan-diolah-jadi-listrik), translated from Indonesian
Print