Indonesian Political, Business & Finance News

Lampung Provincial Government Speeds Up Access Road to Kotabaru Waste-to-Energy Facility; Work 80% Complete

| Source: detikcom Translated from Indonesian | Infrastructure
Lampung Provincial Government Speeds Up Access Road to Kotabaru Waste-to-Energy Facility; Work 80% Complete
Image: detikcom

The Lampung Provincial Government is accelerating construction of infrastructure to support the Waste-to-Energy (PSEL) facility in the Kotabaru area of South Lampung Regency.

One concrete step is speeding up construction of the access road to the PSEL site. The road is crucial to ensuring the infrastructure is ready before construction begins on the large-scale waste-processing facility.

As part of the regional government’s commitment, Lampung Deputy Governor Jihan Nurlela inspected progress on the Kotabaru PSEL access road. During the visit, she observed work on the infrastructure, an important component of the project.

The road will support the construction and future operation of the PSEL facility. Work on the access road, which will be approximately 1.7 kilometres long, is currently around 80% complete.

The Lampung Provincial Government, through its Highways and Construction Agency, is working to accelerate completion so the road can be used in line with the PSEL development schedule.

Asep Wirakarsa, head of the Roads Division at the Lampung Provincial Highways and Construction Agency, welcomed the Deputy Governor’s inspection.

“Thankfully, the Deputy Governor visited us today, and the road to the PSEL site is now 80% complete,” Asep said in a written statement on Monday (9 November 2026).

He said the agency was aiming to finish the work quickly so the main facility’s ground-breaking could take place soon.

“As you can see, we will try to speed things up towards the end of this [year], so that the ground-breaking can take place in December. The total length is 1.7 kilometres,” Asep added.

The accelerated road construction is part of the government’s coordinated efforts to prepare the infrastructure ecosystem for the Kotabaru PSEL facility. Adequate access will support the movement of waste-collection vehicles, the delivery of construction materials and other transport needs.

More than a connecting road, access to the PSEL site is important to the transformation of waste management. The facility is expected to provide a more modern and sustainable solution to waste management in Lampung Province.

The facility will turn waste from an environmental problem into a useful resource by generating electricity. The area could also improve regional connectivity and create opportunities for new economic activity.

By accelerating the supporting infrastructure, the Lampung Provincial Government is demonstrating its commitment to preparing for the PSEL project. It is strengthening coordination among regional agencies so the waste-processing facility can be delivered and provide tangible benefits to the public.

More from 9 November 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/lampung-provincial-government-speeds-up-access-road-to-kotabaru-waste-to-energy-facility-work-80-complete-1794214297)
Originally published by detikcom (https://news.detik.com/berita/d-8745058/pemprov-lampung-percepat-akses-jalan-psel-kotabaru-progres-capai-80-persen), translated from Indonesian
Print