Indonesian Political, Business & Finance News

KRL Service Briefly Halted After Sheet-Metal Roofing Flew on to Tracks Between Depok and Citayam Stations

| Source: detikcom Translated from Indonesian | Infrastructure
KRL Service Briefly Halted After Sheet-Metal Roofing Flew on to Tracks Between Depok and Citayam Stations
Image: detikcom

The KRL Red Line was briefly halted after a sheet-metal roof fell on to the tracks between Depok and Citayam stations. The driver and railway staff went down on to the tracks to remove it.

Video circulating on social media showed rainy, windy conditions. The train stopped and staff got down on to the tracks. On inspection, a sheet-metal roof was found underneath the train.

KAI Commuter Vice-President of Corporate Secretary Karina Amanda said the incident occurred at 3.22pm on Friday (6 November 2026). A resident’s sheet-metal roof had been blown towards the KRL tracks between Depok and Citayam stations.

“Security staff from Citayam Station then went to the site to assist with removing the sheet-metal roof. At 3.26pm, train KA 1314 resumed its journey to Bogor Station,” Karina said in a statement on Friday (6 November).

A subsequent inspection by technical staff at Bogor Station found no damage. The train was able to continue its journey.

“The incident caused a three-minute delay to train KA 1314,” she said.

More from 6 November 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/krl-service-briefly-halted-after-sheet-metal-roofing-flew-on-to-tracks-between-depok-and-citayam-stations-1793965886)
Originally published by detikcom (https://news.detik.com/berita/d-8741614/krl-sempat-berhenti-gara-gara-atap-seng-terbang-ke-rel-stasiun-depok-citayam), translated from Indonesian
Print