KPK Alleges Project Conditioning in Ministry of Transportation Extends Beyond Railway Directorate
Jakarta (ANTARA) - The Corruption Eradication Commission (KPK) suspects that project manipulation practices within the Ministry of Transport (Kemenhub) are not occurring solely within the environment of the Directorate General of Railways (DJKA).
“It is not only in the DJKA; there are also allegations that several projects within the Ministry of Transport have been subject to manipulation,” said KPK Spokesperson Budi Prasetyo to journalists in Jakarta on Friday.
According to Budi, the manipulation of projects outside of the DJKA is carried out by preparing a number of vendors or private parties to ensure they win specific projects.
He stated that this practice is allegedly followed by the provision of funds from private parties to individuals within the Ministry of Transport who assist in securing these projects.
“This means they are interconnected. From the initial process of manipulation or arranging project winners, to the existence of project fees, which can lead to allegations of bribery and gratification,” he said.
Currently, the KPK is investigating suspected bribery in projects involving the construction and maintenance of railway lines within the DJKA of the Ministry of Transport.
The case came to light after the KPK conducted a sting operation (OTT) at the Class I Railway Engineering Office for the Central Java Region on 11 April 2023. This agency is now known as the Class I Semarang Railway Engineering Office.
In this matter, the KPK initially named 10 individuals as suspects related to the alleged corruption of railway line construction and maintenance projects in Java, Sumatra, and Sulawesi.
As of 20 January 2026, the KPK has named 21 suspects, including Sudewo, a member of the House of Representatives (DPR RI) Commission V for the 2019–2024 period. Some of those individuals have already been detained. Additionally, two companies have also been named as corporate suspects.
The case encompasses the Solo Balapan–Kadipiro–Kalioso double-track railway project, railway line construction in Makassar, four railway line construction projects and two supervision projects in Lampegan, Cianjur, as well as level crossing repair projects in Java and Sumatra.
The KPK suspects that project winners are being arranged through the engineering of the procurement process, ranging from the administrative stage to the final determination of tender winners.
Source: jawawa.id (https://jawawa.id/newsitem/kpk-alleges-project-conditioning-in-ministry-of-transportation-extends-beyond-railway-directorate-1782467656)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5624183/kpk-pengondisian-proyek-di-kemenhub-diduga-tak-hanya-terjadi-di-djka), translated from Indonesian