Indonesian Political, Business & Finance News

Kodim Rejang Lebong completes construction of the Garuda Suspension Bridge

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
Kodim Rejang Lebong completes construction of the Garuda Suspension Bridge
Image: Antara (Indonesian)

Rejang Lebong, Bengkulu (ANTARA) – The District Military Command (Kodim) 0409/Rejang Lebong, which oversees three regencies in Bengkulu Province, has completed 100 percent of the Garuda Suspension Bridge construction in Dwi Tunggal Sub-district, Curup. Commander of Kodim 0409/Rejang Lebong, Lt Col Inf Agung Lewis Oktorada, said by phone from Rejang Lebong on Wednesday that the crossing spans 72 metres in length and 1.2 metres in width.

‘Alhamdulillah, the construction of the suspension bridge in Dwi Tunggal Sub-district, which connects to Rimbo Recap village in Curup Selatan District, has been completed 100 percent as of yesterday, Tuesday (19 May),’ he said.

He explained the bridge is projected to bring substantial benefits for daily mobility of around 541 households or more than 1,040 residents living in the area.

The infrastructure development programme, he said, is part of the President Prabowo Subianto’s flagship programme allocated to the territorial area of Kodim 0409/Rejang Lebong. In this area there are two bridge sites: in Dwi Tunggal Sub-district and Lubuk Bingin Baru, Lubuk Bingin Baru is in Sindang Beliti Ilir District (SBI).

He stated that during the construction process, TNI personnel together with local communities carried out each stage of the construction in a spirit of mutual cooperation. The public’s enthusiasm was high because the bridge’s presence provides a solution to transport access that was previously difficult and time-consuming.

‘The bridge’s presence is expected to ease residents’ mobility who previously had to traverse difficult routes for daily activities,’ he said.

Meanwhile, regarding the second suspension bridge project located in Lubuk Bingin Baru Village, Sindang Beliti Ilir District, Agung said the bridge is designed with a 60-metre span and a 1.2-metre width. To date, physical progress at the second site has reached 80 percent and is targeted to be completed in full next week.

The Dandim hopes that the completion of the Lubuk Bingin Baru bridge will provide a positive stimulus to the local economy, particularly for the agriculture sector in the local plantation area. ‘The presence of the suspension bridge in Lubuk Bingin Baru will save travel time and reduce the cost of transporting residents’ harvests to the market,’ said Agung Lewis Oktorada.

More from 20 May 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/kodim-rejang-lebong-completes-construction-of-the-garuda-suspension-bridge-1779543004)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5575755/kodim-rejang-lebong-rampungkan-pembangunan-jembatan-gantung-garuda), translated from Indonesian
Print