KNKT Report Details Braking Traces of Anggrek Train Before KRL Collision
The National Transportation Safety Committee (KNKT) has outlined the braking traces performed by the driver of the KA Anggrek (formerly KA Argo Bromo Anggrek) before colliding with a Commuter Line (KRL) train at Bekasi Timur Station. The KNKT stated that the braking was carried out in stages.
According to the report released on Tuesday (29/09/202 6), the chronology details the accident between KA 4B Argo Bromo Anggrek and KA 5568A Commuter Line on Track 1 of Bekasi Timur Station on 27 April 2026, at 20:52 WIB. The KNKT noted that there were 123 victims in the accident, consisting of 107 injured persons and 16 fatalities.
Chronology of events on 27 April 2026:
At 20:48:24 WIB, a collision occurred between KA 5181B Commuter Line (travelling from Tambun to Bekasi Timur) and an electric battery-based vehicle (taxi) at JPL 8K6 Jalan Ampera.
At 20:48:55 WIB, KA 5568A (KRL) stopped at Track 1 (upstream) of Bekasi Timur Station for passenger boarding and alighting.
At 20:49:19 WIB, KA 5568A (KRL) moved approximately 1.69 metres towards Tambun Station.
At 20:49:24 WIB, KA 5568A (KRL) stopped again as the driver spotted a crowd of people on the upstream track towards Tambun Station.
At 20:50:43 WIB, KA 4B (KA Anggrek) proceeded directly on Track III of Bekasi Station.
At 20:52:12 WIB, a collision occurred between KA 4B and KA 5568A on Track I (upstream) of Bekasi Timur Station.
Service Brake Phase
In its report, the KNKT stated that braking was performed gradually, starting from minimum service brake application to full service, and finally to the emergency brake. The KNKT also detailed the graph showing the relationship between speed and the air pressure of the brake pipe (BP) and brake cylinder (BC), obtained from the locomotive’s data logger on 27 April 2026 between 20:51:18 and 20:52:21.
The KNKT noted that speed control was managed through staged braking using the service brake, from minimum reduction to full service, followed by the emergency brake application. The KNKT stated that the driver only utilised pneumatic brakes or friction brakes.
The service brake phase lasted 37 seconds, beginning at 20:51:16 when the train was 1,341 metres (Km 28+600) from the final stopping point after the collision (Km 28+941), or 1,315 metres from the point of impact with the KRL (Km 28+915). At this time, the throttle was at T7, BP pressure was 71 psi, traction motor current was 168 A, and speed was 108 km/h. The KNKT noted that the driver only received information regarding an accident near Bekasi Timur Station around 20:51.
“This phase ended at 20:51:53 when the train was at a distance of 322 metres (Km 28+641), with the throttle at T4, BP pressure at 49 psi, traction motor current at 144 A, and speed at 79 km/h. Based on recorded conversations between the eastern PPKP and the assistant driver of KA 4B, information regarding a collision on the downstream track of JPL Bekasi Timur was received between 20:51:06 and 20:51:18,” the KNKT wrote.
After receiving this information, the KNKT stated, the driver began braking by moving the automatic brake lever to the minimum reduction position for 9 seconds, from 20:51:18 to 20:51:27. This action, according to the KNKT, was marked by a decrease in BP pressure of 6 psi, from 71 psi to 65 psi.
At 20:51:33, the KNKT stated that the assistant driver of KA 4B informed the eastern PPKP that signal B104 showed a red aspect. At 20:51:34, the driver of KA 4B moved the automatic brake lever to the full service position and maintained it until 20:51:43.
“During this period, the train moved from 863 metres (Km 28+078) to 611 metres (Km 28+333), while the throttle position was gradually reduced from T7 to T5. Simultaneously, the BP air pressure experienced a significant drop from 62 psi to 49 psi within 9 seconds. A BP pressure of 49 psi indicates that full service braking had been fully established,” the KNKT wrote.
Briefly, between 20:51:43 and 20:51:55, or at positions 611 metres (Km 22+078) to 322 metres (Km 28+619), the driver maintained braking at the full service position. This was evidenced by the BP pressure remaining at 49 psi for 13 seconds. At the 344-metre position (Km 28+545), the driver reduced the throttle from T5 to T4.
Emergency Brake Phase
The KNKT stated that the emergency brake phase lasted 25 seconds, from 20:51:56 to 20:52:21. The emergency brake was activated at Km 28+588, approximately 275 metres before KA 4B (Anggrek) struck the KRL KA 5568A at Km 28+915.
“After the collision, KA 4B continued to move for 26 m and finally stopped at Km 28+941. The emergency brake was activated when the train’s speed had dropped to 78 km/h. This action was taken by the driver as a last resort to stop the train after seeing the rear carriages of KA 5568A,” the KNKT stated.
Within a 4-second window, the KNKT noted that BP pressure dropped drastically from 43 psi to 0 psi, while BC pressure rose sharply from 0 psi to 70 psi.
“During this same period, the throttle position dropped gradually from T4 to T1 and then to the idle position. The activation of the emergency brake on the train set was indicated by the pneumatic control switch (PCS) changing to the ‘Open’ position. This condition automatically cut off the electrical current to the traction motors, forcing the throttle to the idle position and causing the traction motor current to drop drastically from 104 A to 0 A,” the KNKT wrote.
During this period, the train’s speed decreased from 78 km/h to 70 km/h. While the emergency braking was still in progress, at 20:52:03 or at a distance of 163 metres, the throttle was at idle, BP pressure was 0 psi, BC pressure was 70 psi, the locomotive traction motor load was 0 A, and the speed was 65 km/h. The KNKT stated that the driver of KA 4B also activated the independent brake, a braking system that directs…
Source: jawawa.id (https://jawawa.id/newsitem/knkt-report-details-braking-traces-of-anggrek-train-before-krl-collision-1790676045)
Originally published by detikcom (https://news.detik.com/berita/d-8684446/jejak-pengereman-ka-anggrek-sebelum-tabrak-krl-dalam-laporan-knkt), translated from Indonesian