Indonesian Political, Business & Finance News

Kebagusan Retention Pond Aims to Cut Upstream Flooding by up to 2%

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
Kebagusan Retention Pond Aims to Cut Upstream Flooding by up to 2%
Image: Antara (Indonesian)

Jakarta (ANTARA) – The Jakarta Provincial Government is targeting the Kebagusan retention pond in Pasar Minggu, South Jakarta, to reduce flooding in the upstream Mampang area by around 1.43–2%.

“The reduction at the Kebagusan retention pond is approximately 1.43 to 2 per cent,” said Ika Agustin, head of the Jakarta Water Resources Agency, during an inspection of the pond’s construction in South Jakarta on Tuesday.

Ika stressed that the reduction should not be viewed solely as a figure, but also in terms of the volume of water the pond can hold before it flows downstream.

“What we need to explain to the public is not to focus on the one per cent, but on the volume of water we can hold back before it flows downstream,” she said.

According to the Jakarta Water Resources Agency, construction of the Kebagusan retention pond will cost at least Rp254 billion. This comprises Rp54 billion for construction, while acquiring two hectares of land costs Rp200 billion.

The Kebagusan pond, several other retention ponds and the normalisation of the Krukut River are expected to reduce flooding across the Krukut-Mampang drainage system by around 8%.

The agency also plans to combine two approaches in future pond construction: grey infrastructure and blue-green infrastructure.

The Kebagusan pond is around five metres deep, measured from the top of the capping beam, and is equipped with an inlet, an outlet and a floodgate. The project also includes improvements to the PHB Jowe drainage channel.

The Jakarta Water Resources Agency acknowledged that limited road access has been one of the challenges in building retention ponds.

The issue will inform future planning, so that construction of ponds and reservoirs also includes the provision of access roads to the sites.

More from 13 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/kebagusan-retention-pond-aims-to-cut-upstream-flooding-by-up-to-2-1791899629)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5784117/embung-kebagusan-ditargetkan-tekan-banjir-di-hulu-hingga-2-persen), translated from Indonesian
Print