Indonesian Political, Business & Finance News

KCI Responds to Rumours of Soekarno-Hatta Airport Train Being Replaced by Priok-Kota Commuter Line

| Source: CNBC Indonesia Translated from Indonesian | Infrastructure
KCI Responds to Rumours of Soekarno-Hatta Airport Train Being Replaced by Priok-Kota Commuter Line
Image: CNBC Indonesia

PT KAI Commuter Indonesia (KCI) has responded to widespread rumours that the Soekarno-Hatta Airport Rail Link is being prepared to serve as the ‘Pink Line’ KRL, running from Jakarta Kota Station to Tanjung Priok Station.

The Vice President of Corporate Secretary at KAI Commuter, Karina Amanda, briefly revealed that the matter is still under discussion. “It is currently still being discussed. We will provide an update once certainty is reached and a formal release is made,” Karina told CNBC Indonesia on Thursday (10/09/2026).

Previously, reports emerged suggesting the Airport Rail Link would be repurposed for the Priok-Kota KRL route. Circulating videos appeared to show spare Airport Rail Link carriages undergoing track inspections on the Jakarta Kota-Tanjung Priok route. Meanwhile, two Tokyo Metro-series KRL train sets, which currently serve the Jakarta Kota-Tanjung Priok route, are reportedly slated for transfer to the Jakarta Kota-Bogor route.

KCI is currently facing a shortage of rolling stock on the Jakarta Kota-Bogor (Red Line) route. This is due to seven new KRL train sets produced by PT Industri Kereta Api (Persero), known as INKA, being sent to the workshop for comprehensive inspections. This maintenance procedure is being conducted by KCI in collaboration with INKA for the iE305 series.

The inspections began on 7 September 2026 and are scheduled to continue until the end of the month. Consequently, KCI has had to adjust several Commuter Line services, particularly on the Bogor line.

“KCI, together with INKA, is currently conducting a general check-up for the iE305 KRL series produced by INKA, starting from the 7th of September,” said Karina.

Karina explained that the inspection is not limited to a single train set. A total of seven iE305 train sets are scheduled to undergo general check-ups in stages. “For the time being, we have scheduled this because there are seven train sets in total, so it will run from the 7th until 30 September 2026,” she added.

The maintenance of these seven INKA-produced train sets has forced KCI to reorganise Commuter Line travel patterns. Operationally, 17 trips have undergone adjustments, all of which are located on the Bogor Line.

“Yes, due to the general check-ups being conducted on the seven train sets, we are adjusting the Commuter Line schedules. Currently, 17 trips have been adjusted, all within the Bogor Line,” she stated.

These adjustments have also led to a reduction in the total number of KRL trips operated by KCI on weekdays during the inspection period. Prior to the commencement of the general check-ups, KCI operated 1,065 trips per day on weekdays. This number has decreased to 1,048 trips per day while the seven INKA-produced train sets undergo their inspections.

More from 10 September 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/kci-responds-to-rumours-of-soekarno-hatta-airport-train-being-replaced-by-priok-kota-commuter-line-1788998147)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260909161136-4-766609/heboh-kabar-ka-bandara-soetta-jadi-krl-priok-kota-kci-buka-suara), translated from Indonesian
Print