Indonesian Political, Business & Finance News

Kalawi Bridge in Padang to Be Rebuilt with Rp25.5 Billion Budget

| Source: detikcom Translated from Indonesian | Infrastructure
Kalawi Bridge in Padang to Be Rebuilt with Rp25.5 Billion Budget
Image: detikcom

The central government has confirmed that the reconstruction of the Kalawi-Limau Manih Bridge in Pauh District, Padang, West Sumatra, will proceed shortly. The bridge, previously damaged by a hydrometeorological disaster in late 2025, will be rebuilt as a steel truss structure spanning approximately 70 to 80 metres.

The assurance was conveyed by Deputy Chairman of Commission VI of the Indonesian House of Representatives from the Gerindra Party, Andre Rosiade, during a site inspection on Friday (21/8). Andre was accompanied by relevant officials, including Head of the West Sumatra National Road Implementation Agency (BPJN) Elsa Putra Friandi and Head of the Sumatra V River Basin Agency (BWS) Padang Reski Wahyudi.

Andre stated that the reconstruction of the Kalawi-Limau Manih Bridge is part of the central government’s rehabilitation and reconstruction programme for infrastructure affected by disasters. The budget allocated for the project amounts to Rp25.5 billion.

“God willing, this bridge will be built with a length of 70 to 80 metres using a steel truss. The budget is Rp25.5 billion. The tender will be held in January 2027, and construction work will commence by the end of February 2027,” he said in a written statement on Friday (21/8/2026).

Head of BPJN West Sumatra Elsa Putra Friandi explained that the reconstruction of the Kalawi-Limau Manih Bridge is part of President Prabowo Subianto’s rehabilitation and reconstruction programme for infrastructure recovery following the hydrometeorological disaster.

“This bridge is included in the President’s rehabilitation and reconstruction programme for the recent hydrometeorological disaster. We plan to conduct the tender in January 2027, and after all processes are completed, at the latest by the end of February we will begin construction of the 70 to 80-metre steel truss bridge,” he said.

He noted that safety aspects are a primary concern in the bridge reconstruction, given that the river flow conditions around the site are considered highly susceptible to scour erosion.

According to him, the design prepared by the Padang City Government has undergone an assistance process with technical agencies, including the River Engineering Agency. This process was carried out to ensure the design aligns with field conditions.

“The design is from the Padang City Agency. We directed the design for assistance with the River Engineering Agency. This has gone through several rounds of assistance, so there will be protections at the abutments and structures to ensure the bridge can withstand the current over the long term,” he explained.

The protection will focus on the area around the bridge, particularly the abutments and structural elements. This measure is intended to strengthen the bridge construction against river currents.

He assessed that the reconstruction of the Kalawi-Limau Manih Bridge demonstrates the central government’s attention to the aspirations of the people of West Sumatra. The project will help the community regain safe connecting access after the previous bridge was affected by the disaster.

“This shows the commitment of the central government, the government of President Prabowo, which listens to the aspirations of the people. Once again, we express our gratitude to President Prabowo and Minister of Public Works Dody Hanggodo for allocating the budget,” he said.

Andre added that the Rp25.5 billion budget for the bridge construction is part of the rehabilitation and reconstruction allocation prepared by the central government to address disaster impacts.

“This construction budget is part of the rehabilitation and reconstruction budget prepared from the Rp19 trillion allocation. This is part of it,” he concluded.

With the inclusion of the Kalawi-Limau Manih Bridge reconstruction in the rehabilitation and reconstruction programme, Andre expressed hope that the tender process and physical works will proceed according to target. Residents in the Kalawi-Limau Manih area are expected to soon have safer crossing access with a construction more resistant to river conditions.

Also present were Head of the West Sumatra Cipta Karya Agency Maria Doeni Isa, Chairman of the Gerindra Party Faction in the Padang Regional House of Representatives Wahyu Hidayat, and Chairman of Commission II of the Padang Regional House of Representatives Rachmad Wijaya. The inspection was conducted to assess the bridge condition and ensure the reconstruction plan proceeds.

More from 21 August 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/kalawi-bridge-in-padang-to-be-rebuilt-with-rp25-5-billion-budget-1787298891)
Originally published by detikcom (https://news.detik.com/berita/d-8628642/jembatan-kalawi-padang-akan-dibangun-kembali-anggaran-rp-25-5-miliar), translated from Indonesian
Print