KAI Proposes Importing Second-hand Trains to Address KRL Crisis; Commission VI of DPR Responds
PT Kereta Api Indonesia (Persero), known as KAI, has proposed re-importing used electric multiple unit (KRL) trains from abroad. KAI views this move as an emergency solution to address the threat of a crisis or shortage of KRL fleets in the Jabodetabek area during the 2026 to 2029 period.
KAI President Director Bobby Rasyidin revealed that the current KRL fleet has reached a critical age. Many units must be retired or decommissioned due to age and safety concerns.
“These Japanese trains will be 45 years old by 2028. Once our trainsets reach 45 years, we can no longer use them. Firstly, spare parts are no longer available. Secondly, the metal is beginning to suffer from fatigue,” Bobby stated during a meeting with Commission VI of the House of Representatives (DPR) in Jakarta on Monday (23/09/2026).
He explained that by 2031, KAI will need to replace at least 87 KRL trainsets. Meanwhile, in 2026, KAI projects a shortage of up to 22 trainsets due to delivery delays and the necessity of decommissioning 13 older trainsets.
On the other hand, the production capacity of the domestic industry, namely PT INKA (Persero), is currently unable to meet this sudden surge in demand. Although PT INKA is being pushed through State Capital Injections (PMN) to increase capacity to 15-16 trainsets per year, this process requires time.
Therefore, Bobby views the option of importing refurbished second-hand KRLs as the most realistic way to ‘patch’ the fleet shortage quickly.
“So, one of the things we will propose is to patch the gap, Sir, by importing trains that are not new. Trains that are historically good and have undergone refurbishment, similar to how aircraft are handled,” Bobby explained.
Bobby views this option as a short-term solution to ensure Jabodetabek KRL services are not disrupted, considering that daily passenger projections are expected to reach 2.5 to 3 million people in the future.
“This is a fast and appropriate way to address the capacity shortage in 2026, 2027, 2028, and up to 2029, while we simultaneously increase the production capacity of PT INKA,” he concluded.
Response from Commission VI of the DPR
Responding to the proposal, the Vice Chairman of Commission VI of the DPR, Andre Rosiade, expressed support for KAI’s move. Reading the meeting’s conclusion, Andre stated:
“Meeting the capacity needs of railway transport, particularly the Jabodetabek KRL, by strengthening the local industry and conducting integrated and sustainable imports of non-new train sets.”
However, Andre requested that synergy with PT INKA must remain strengthened so that the company can continue to compete.
“Procuring non-new rolling stock as a transitional solution, while maintaining synergy with PT INKA by increasing its Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) to a proper Level 9 in terms of technological quality and national industrial competitiveness,” he added.
Source: jawawa.id (https://jawawa.id/newsitem/kai-proposes-importing-second-hand-trains-to-address-krl-crisis-commission-vi-of-dpr-responds-1790175463)
Originally published by detikcom (https://news.detik.com/berita/d-8676303/kai-usul-impor-kereta-bekas-atasi-krisis-krl-ini-respons-komisi-vi-dpr), translated from Indonesian