Indonesian Political, Business & Finance News

KAI Madiun Operational Area repairs track geometry at three level crossings in Kediri

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
KAI Madiun Operational Area repairs track geometry at three level crossings in Kediri
Image: Antara (Indonesian)

Madiun (ANTARA) – PT Kereta Api Indonesia (Persero)’s Madiun Operational Area 7 in East Java is repairing the track geometry at three level crossings in Kediri to maintain the reliability of railway infrastructure and ensure safe and comfortable train journeys.

KAI Daop 7 Madiun Public Relations Manager Tohari said in Madiun on Friday that improving level-crossing geometry was an important part of infrastructure maintenance, ensuring railway lines remained reliable and met operational safety standards.

The three level crossings are JPL 287 in Ngasem District, JPL 289 in Gampengrejo District and JPL 268 in Ngadiluwih District, he said.

The work is scheduled to take place in stages over three nights, from Friday, 23 October 2026, to Monday, 26 October 2026. Each night, work will run from 8pm to 5am Western Indonesian Time (WIB).

“Maintaining and improving infrastructure is part of KAI’s commitment to ensuring the safety of train journeys. Through the geometry repairs at these three crossings, we are continuing to ensure that infrastructure remains in good condition so train services can operate safely, smoothly and reliably,” Tohari said.

He explained that staff activity, equipment use and the placement of materials near the sites could affect the flow of road traffic while the work was under way.

KAI therefore urged members of the public, particularly road users who regularly travel through the three locations, to plan ahead and adjust their departure times.

“We apologise to the public, especially road users, for any inconvenience that may arise while the work is under way. We urge people to plan their journeys carefully, adjust their departure times and consider using alternative routes where possible,” he said.

Tohari also reminded the public to take extra care when approaching the work sites. Road users should pay attention to traffic signs, follow instructions from staff on site and stay out of areas cordoned off for the work.

KAI Daop 7 Madiun remains committed to ongoing infrastructure maintenance as part of its efforts to improve railway operational safety.

The work also demonstrates KAI’s responsibility for maintaining the quality of railway infrastructure so it can continue to support public mobility.

More from 23 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/kai-madiun-operational-area-repairs-track-geometry-at-three-level-crossings-in-kediri-1792745607)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5807187/kai-daop-madiun-perbaiki-geometri-di-tiga-perlintasan-wilayah-kediri), translated from Indonesian
Print