KAI Logistik Increases Capacity of Ronggowarsito Train, Transporting 13,500 Tonnes of Goods per Month
JAKARTA - KAI Logistik is currently studying the enhancement of container transport capacity via the Ronggowarsito train to strengthen goods distribution connectivity, particularly for industrial areas in Semarang and surrounding regions.
Director of Business Development at KAI Logistik, Aniek Dwi Deviyanti, stated that this step is being taken in line with the growing demand for goods distribution from industrial players who require large-scale and scheduled logistics services.
“By optimising the Ronggowarsito train service, KAI Logistik is present to address logistics challenges in Central Java, while also providing added value for manufacturing companies that need more efficient and reliable transport modes compared to other options,” Aniek said in a press release on Friday (8/5/2026).
KAI Logistik considers this service as one of its strategic advantages amid the continuously increasing demand for logistics distribution.
Additionally, the service is also directed towards strengthening the logistics hub in Klari, Karawang.
This integration aims to support the efficiency of distribution in the Karawang industrial area while facilitating more effective repositioning of shipping line transport.
“This capacity is equivalent to 50 TEUs or 900 tonnes per trip. When accumulated, the service can handle up to 13,500 tonnes of goods per month, expected to be operational starting in May 2026,” she said.
KAI Logistik states that the strengthening of this service is focused on serving the manufacturing and fast-moving consumer goods (FMCG) sectors.
Both sectors are deemed to require timely distribution as well as safe and stable goods handling.
According to KAI Logistik, the capacity development of the Ronggowarsito train is part of the company’s strategic roadmap to strengthen the role of rail transport in the middle mile segment of the national supply chain.
The company views the strengthening of logistics services in the northern Java corridor as crucial to supporting national industrial competitiveness through the integration of rail infrastructure with strategic economic centres.
Aniek stated that this capacity adjustment is a company step in building a more resilient and sustainable distribution system.
“Through the green logistics concept, rail-based transport contributes to reducing carbon emissions and road traffic loads. This aligns with KAI Logistik’s commitment to supporting a more environmentally friendly national logistics system, while also strengthening connectivity in strategic industrial areas such as Semarang,” Aniek added.
Source: jawawa.id (https://jawawa.id/newsitem/kai-logistik-increases-capacity-of-ronggowarsito-train-transporting-13-500-tonnes-of-goods-per-month-1778226955)
Originally published by Kompas (https://money.kompas.com/read/2026/05/08/135153026/kai-logistik-tambah-kapasitas-ka-ronggowarsito-angkut-13500-ton-barang-per?utm_source=ABC&utm_medium=rss), translated from Indonesian