KAI: Government Allocates Rp2 Trillion for Bali Rail Project
JAKARTA — PT Kereta Api Indonesia (Persero) president director Bobby Rasyidin said the government was preparing approximately Rp2 trillion for a rail service construction project in Bali.
Bobby said construction of the planned Bali railway or tram would take about two years. The project would be divided into two phases: from I Gusti Ngurah Rai International Airport to Legian, and from Legian to Canggu.
“We have stated that the budget for the Bali rail project is around Rp2 trillion or more,” Bobby said after meeting President Prabowo Subianto at the Presidential Palace complex in Jakarta on Thursday (5 November 2026).
He explained that the rail service project would be built in two phases. The first would connect I Gusti Ngurah Rai Airport with Legian, while the second would link Legian with Canggu.
“The Bali railway or tram has two stages as well: phase one from Ngurah Rai to Legian, then phase two from Legian to Canggu. It will take two years,” he said.
In addition to reporting on the Bali rail project, Bobby also discussed accelerating the revitalisation of Gambir Station in Jakarta with President Prabowo. The project is to be integrated with plans to redevelop the area around the National Monument (Monas).
He said the revitalisation would cover the landscaping of Monas Park as well as Gambir Station, creating an integrated area.
The budget for the Gambir Station revitalisation is also expected to reach approximately Rp2 trillion, with the work targeted for completion in 2028.
“Then for Gambir Station, it is about the same (Rp2 trillion),” Bobby said.
The Gambir Station revitalisation project will also take into account connections with other modes of transport, including linking the eastern corridor in the Gambir area with the Jakarta MRT on the western corridor.
Source: jawawa.id (https://jawawa.id/newsitem/kai-government-allocates-rp2-trillion-for-bali-rail-project-1793944240)
Originally published by Republika (https://ekonomi.republika.co.id/berita/to2ctg502/kai-pemerintah-siapkan-rp2-triliun-untuk-pembangunan-proyek-kereta-bali), translated from Indonesian