KAI and INKA Ensure Timely Maintenance of 7 KRL iE305 Trainsets, Prioritising Safety
PT Kereta Api Indonesia (Persero), in collaboration with PT Industri Kereta Api (Persio) or INKA, is continuing maintenance on seven KRL iE305/CLI 225 trainsets to ensure rolling stock readiness in supporting Jabodetabek Commuter Line operations.
KAI President Director Bobby Rasyidin conducted a working visit to INKA’s facilities in Madiun on Friday, 11 September 2026, to personally oversee the progress of the maintenance and coordinate the acceleration of the work with relevant parties. During the visit, Bobby ensured that the maintenance process for the seven trainsets is proceeding according to target, while prioritising safety and equipment reliability. KAI emphasised that coordination between all parties remains ongoing to maintain the readiness of the Jabodetabek Commuter Line services, which serve the public’s mobility needs.
“KAI ensures that every maintenance process is carried out in accordance with applicable safety and reliability standards. The readiness of Jabodetabek Commuter Line services is our primary concern given the high demand for public mobility,” said Bobby.
KAI Vice President of Corporate Communication, Anne Purba, explained that the maintenance of the seven KRL iE305/CLI 225 trainsets is being conducted in stages alongside INKA, KAI Commuter, and other relevant parties. The process includes inspections of systems, technical components, and safety aspects before the trains are returned to service.
Anne explained that currently, one KRL iE305/CLI 225 trainset is in the final stages of inspection and is targeted to be ready this week. Subsequently, the remaining six trainsets will be completed gradually, with a target of three trainsets finished by 25 September 2026 and the final three by 9 October 2026.
“Every trainset that has completed the full series of inspections and is declared ready will be handed over to KAI Commuter to support Jabodetabek Commuter Line services according to operational requirements,” said Anne.
Anne added that KAI is ensuring continued collaboration between KAI Commuter, as a subsidiary of KAI, and INKA to complete the maintenance of the seven trainsets within the established timeframe. This collaboration is a vital part of maintaining the readiness of the Jabodetubeck Commuter Line to support the mobility needs of the Greater Jakarta region.
“Thorough inspections are being conducted to ensure that every trainset returning to operation meets safety standards, equipment reliability, and the operational needs of the Jabodetabek Commuter Line,” said Anne.
The Jabodetabek Commuter Line is one of the primary transportation services for the public, with mobility levels steadily increasing. In the last decade, the number of Jabodetabek KRL users rose from 257 million passengers in 2015 to 401 million in 2025. Between January and August 2026, passenger numbers reached 277.2 million.
This increase in mobility has been accompanied by the expansion of the Jabodetabek KRL service network. The number of stations increased from 71 stations in 2015 to 85 stations in 2026 to support public travel needs.
KAI ensures that the rolling stock maintenance process continues through coordination between KAI, INKA, KAI Commuter, and relevant parties. Every stage of the work is directed towards maintaining the operational readiness of the Jabodetabek Commuter Line, prioritising passenger safety.
“KAI, along with all relevant parties, will continue to maintain the quality of Jabodetabek Commuter Line services through equipment readiness and continuous evaluation in accordance with applicable safety standards,” Anne concluded.
Source: jawawa.id (https://jawawa.id/newsitem/kai-and-inka-ensure-timely-maintenance-of-7-krl-ie305-trainsets-prioritising-safety-1789542479)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5743440/kai-dan-inka-pastikan-perawatan-7-trainset-krl-ie305-tepat-target-safety-jadi-prioritas), translated from Indonesian