Indonesian Political, Business & Finance News

Beer firm moves out of the old

Beer firm moves
out of the old

PT Delta Jakarta, a joint-venture beer manufacturing company,
is planning to relocate its present 5.5 hectare brewery on Jl.
Bandengan Selatan, West Jakarta. They will be moving to a 14
hectare plot in the Setiadarma village in Tambun district,
Bekasi.

The relocation is aimed at increasing the company's production
capacity to anticipate growing sales volume.

Harsono E. Saleh, president of the company, made the
announcement Thursday in a meeting with the City Council's
Commission B on economy and industry. He added that total sales
of the company shot up from 254,000 liters in 1985 660,000 liters
last year.

At present, the company is using about 80 to 85 percent of its
total production capacity of 600,000 hectoliters per year, Pedro
G. Picornell, the company's production director told The Jakarta
Post. One hectoliter is equal to one hundred liters.

The new brewery will have a production capacity of 1.1 million
hectoliters, Harsono said.

AM Sjahrial, the company secretary, said construction of the
new brewery is estimated to cost between 100 billion and 200
billion rupiah. Construction of the brewery is scheduled to begin
this October.

She said that in order to finance the construction, either the
company's shareholders should inject fresh capital or they must
borrow money from the bank.

The city administration has a 30 percent stake in the brewery
company.

According to Harsono, PT Delta's share in the Indonesian beer
market is 36 percent, second to PT Multi Bintang, the market
leader, which holds 56 percent.

PT Delta produces beer under the brand names of Anker Bir,
Anker Stout and Shanta Super Shandy. It also produces Carlsberg
Beer under license. (06)

Electricity museum
runs out of juice

The construction of the electricity museum at the Taman Mini
Indonesia Indah park, scheduled to be completed next year, needs
another Rp 8 billion.

Zuhal, president of the state-owned PLN electricity company,
said the construction of the museum needed Rp 15 billion (US$
7.03 million) in total. So far the committee for the construction
of the museum had collected Rp 7 billion (US$ 3.2).

The funds were taken from PLN's annual budget and
contributions from foreign and local electricity contractors.

Zuhal spoke during a ceremony to receive donations from four
electricity contractors, including two from the Netherlands, NKF
Kabel BV and Holee Systemen en Compenenten BV; Austrian Energy &
Environment Waagner-Biro from Austria; and PT Wijaya Karya, a
local company.

The four donated US$ 250,000 respectively.

So far, the committee had reportedly built 82 percent of the
physical structure of the premises with the money it had
garnered.

Zuhal was quoted by Antara as saying the construction was
scheduled to finish by March 1995.

The museum, which was built on a 6.3-hectare plot, consists of
four premises, with Electricity Museum at its center, and three
smaller ones around it. They are the New Energy Museum, the
Conventional Energy Museum, and the Fossil Fuels Energy Museum.
(jsk)

Awards for 15
successful women

Fifteen Indonesian women, selected by the Jakarta Program
magazine and the Bumiputera life insurance company, will receive
achievement awards for their contributions to national
development.

The awards will be presented tonight at a Charity Dinner at
the Sangri-La hotel in Jakarta to mark Kartini Commemoration Day.

The event, the second to be held since 1993 by the magazine,
will feature a fashion show displaying works of Kenzo Takada,
Ghea Sukarya and Prayudi.

All the proceeds gained from the event will be donated to the
Indonesian Red Cross and the victims of quake in Liwa, Lampung.

The women who will receive the awards include the Indonesian
Democratic Party (PDI) chairperson Megawati Soekarnoputri,
badminton player Susi Susanti, Amelia A. Yani, Herawati Diah,
Herlina Kasim, Sri Hartati Mudaya, Meity Robot, Juliah Sukamdani,
Ghea Sukarya, Umi Mbok Berek, Mooryati Sudibyo, Lestari Suyono,
Sri Andani, Diah Iskandar, and businesswoman Itjih Nursalim.

The chairman of the Selection Committee, Warsito Wahono, said
the selection is based on the ideas, inspiration, and efforts
they have contributed to national development and prestige. (
kod)

City populations
now in balance

The city's population growth is considered to be in a state of
balance, Ritola Tasmaya, head of the city branch of the National
Family Planning Coordinator Agency (BKKBN), stated yesterday.

Ritola said at the opening ceremony of the meeting on family
planning and happy families that indications of the balanced
population growth could be seen from the decreases of the total
fertility, gross birth and death rates.

According to records cited by Ritola, the city's total
fertility rate declined from 5.2 children per a woman in 1970 to
2.1 children per a woman in 1991.

The birth rates dropped from 36.3 children per one thousand
people in 1970 to 21.7 children in 1990. And the death rate also
decreased from 9.9 people per one thousand in 1970 into 6.4
people in 1990.

Present at the meeting were heads of non-governmental
organizations, groups of professionals as well as officials from
the city chapter of the BKKBN. (11)

More from 23 April 1994 โ†’

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/jp3focus0-set-12pts-u75-1-col-2-lines-1447893297-1022016)
Originally published by The Jakarta Post
Print