Jasa Marga Reveals Repairs to Three Toll Roads in Jabodetabek
Jasa Marga, the toll road operator, is carrying out repairs on three toll roads in Jabodetabek: the Jakarta Outer Ring Road (JORR), the Tol Dalam Kota, and the Jakarta–Tangerang Toll Road. The work began on Friday, 6 March 2026, and is targeted for completion by Monday, 9 March 2026.
Alvin Andituahta Singarimbun, Senior Manager Representative Office 1, Jasamarga Metropolitan Tollroad Regional Division, said the maintenance project involves road-surface resurfacing on the JORR stretch and runs from Friday, 6 March 2026 to Monday, 9 March 2026.
“One lane that is the work area will be temporarily closed to traffic, while other lanes will remain open as traffic lanes,” he said in a written statement on Saturday, 7 March 2026.
Here are the repair points on the JORR being carried out by Jasa Marga.
Direction Rorotan
Lane 2, km 36+825 to 41+015, five work points scheduled Friday, 6 March 2026 at 14:00 WIB to Monday, 9 March 2026 at 05:00 WIB.
Direction Pondok Indah
Lane 2, km 18+650 to 17+210, three work points scheduled Friday, 6 March 2026 at 21:00 WIB to Monday, 9 March 2026 at 05:00 WIB.
Repairs on the Tol Dalam Kota:
This repair involves scraping, filling and overlay (SFO). The project runs from Saturday, 7 March 2026 to Sunday, 8 March 2026, located in the Taman Mini Indonesia Indah direction on Lane 1, km 03+490 to 03+598, starting Saturday, 7 March 2026 at 21:00 WIB to Sunday, 8 March 2026 at 05:00 WIB.
Repairs on the Jakarta–Tangerang Toll Road:
Work also involves SFO at several points, including:
- Rigid reconstruction work
Direction Tangerang
Lane 1, km 15+240 to 15+270, from Saturday, 7 March 2026 at 22:00 WIB to Monday, 9 March 2026 at 05:00 WIB.
- Scraping, Filling and Overlay (SFO)
Direction Jakarta
Lane 3, km 26+350 to 26+250, from Saturday, 7 March 2026 at 22:00 WIB to Sunday, 8 March 2026 at 05:00 WIB.