Jakarta Targets 100% Piped Water Coverage with 7,000 km of New Pipes
Jakarta is targeting 100% piped water coverage by 2029, meaning the construction of new networks must be accelerated in the coming years. PAM Jaya is preparing around 7,000 kilometres of new pipe networks to expand service coverage.
PAM Jaya’s Director of Engineering, Akhmad Santika, said the new networks will complement the existing pipe network, which currently spans around 13,000 km.
According to him, the sheer scale of network construction means occupational health and safety (K3) aspects need to be strengthened as construction activity on the ground increases.
“Network construction work going forward will be increasingly massive. Therefore, the implementation of K3 SOPs must be a primary concern in every job,” he said in a statement on Sunday (9/8/2026).
PAM Jaya is currently developing a field work monitoring system to strengthen oversight of its partners. Partner identities will be displayed on PPDU standards and barriers at every work site to clarify which party is responsible for the work.
“Safety is a shared responsibility, so all partners must have the same concern for K3 implementation without exception,” said Santika.
PAM Jaya’s Director of Strategy and Business, Anugrah Esa, said a number of workplace accident cases have become evaluation material in the implementation of infrastructure development. Therefore, K3 implementation needs to be positioned as a working culture, not merely the fulfilment of administrative obligations.
PAM Jaya is currently also accelerating the construction of network infrastructure. However, the condition of some pipe networks that are more than a century old means field work faces its own technical and safety challenges.
“Therefore, K3 implementation must not be viewed as merely an administrative obligation, but rather must become a working culture that is consistently carried out to protect workers, maintain public safety, and ensure continuity of service to customers,” he said.
PAM Jaya’s President Commissioner, Prasetyo Marsudi, reminded all work partners to prioritise safety in every job. According to him, project implementation must also consider the interests of customers and communities affected by the work.
“Every job must be carried out safely, orderly, responsibly, and with a priority on compliance with established work safety standards,” he said.
With the addition of around 7,000 km of new networks, the expansion of Jakarta’s piped water infrastructure over the next few years will be one of the largest construction undertakings. Strengthening K3 oversight is essential so that the expansion of water service access goes hand in hand with the protection of workers and the public.
Source: jawawa.id (https://jawawa.id/newsitem/jakarta-targets-100-piped-water-coverage-with-7-000-km-of-new-pipes-1786355613)
Originally published by Republika (https://ekonomi.republika.co.id/berita/tjjq0u416/jakarta-kejar-100-persen-layanan-air-perpipaan-7000-km-pipa-baru-disiapkan), translated from Indonesian