Indonesian Political, Business & Finance News

Inside the Sukoharjo Tramadol Factory Capable of Producing Millions of Pills a Day

| Source: detikcom Translated from Indonesian | Legal
Inside the Sukoharjo Tramadol Factory Capable of Producing Millions of Pills a Day
Image: detikcom

Metro Jaya Regional Police have uncovered a Tramadol factory in Sukoharjo, Central Java, which produced prescription-only medicines on a large scale. Using high-capacity production machinery, the factory was reportedly able to make up to millions of Tramadol pills a day.

“We seized raw materials and high-capacity production machinery, including mixing machines, presses and tablet-making equipment. What you can see here is just a sample from the site in Central Java, where the two factories are located,” Metro Jaya Police narcotics director, Senior Commissioner Bismo Teguh Prakoso, told a press conference at his office on Wednesday (21 October 2026).

In the operation, police identified 13 types of raw material weighing a total of 29 tonnes. They also seized 270 litres of liquid materials from two factories in Kartasura and Gatak districts, Sukoharjo.

“The equipment includes nine mixing machines, two tablet presses, three strip-printing machines and two plastic-sealing presses,” he added.

At the Kartasura factory, police seized one tonne of white powder ready for pressing. According to Bismo, that quantity could have produced 7,535,715 Tramadol tablets.

At the same factory, police also seized 1,485,000 Tramadol tablets ready for packing and 2,372,500 tablets ready for distribution. They seized two motorbikes and a box van at the site as well.

“The first factory had daily turnover of Rp2 billion to Rp3 billion. It could produce 55 cartons a day, or a total of 1.7 million tablets,” he said.

At the second factory, in Gatak district, police seized one tonne of white powder, which they estimated could produce 9,892,857 Tramadol pills. They also seized 215 kilogrammes of yellow powder ready for pressing, equivalent to about 1,535,714 pills.

“The yellow powder was a failed batch. It had hardened and clumped, so it could not be used. There were 125 kilogrammes, equivalent to 892,857 pills. We also seized 620,000 white tablets ready for packing, 2,047,000 white Trihexyphenidyl tablets and 38,000 yellow Trihexyphenidyl tablets,” he said.

“The second factory had turnover of Rp800 million a day and could produce 20 cartons, or 640,000 tablets, per day. You can imagine how much we have prevented from reaching the market,” he added.

Metro Jaya Police have arrested 16 suspects in the case and are still pursuing two people believed to own the factories.

More from 21 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/inside-the-sukoharjo-tramadol-factory-capable-of-producing-millions-of-pills-a-day-1792579944)
Originally published by detikcom (https://news.detik.com/berita/d-8717618/penampakan-mesin-produksi-tramadol-di-pabrik-sukoharjo-cetak-jutaan-pil-sehari), translated from Indonesian
Print