Indonesia's New Highest Elevated Toll Road in Jakarta, Earthquake-Resistant for 1,000 Years
Indonesia has its highest elevated toll road, the Harbour Road II Toll Road for the Ancol Timur–Pluit section. This elevated toll road is being built above an existing toll road, namely the Sedyatmo Toll Road.
Featuring a multi-level elevated structure standing 38 metres high, the Harbour Road II Toll Road becomes the highest toll road in Jakarta, surpassing the MBZ Elevated Toll Road which has a height of 15 metres. Construction progress on this elevated toll road has reached 44.12 percent, and land acquisition is estimated to have reached 77%.
“Our progress is 44.12% with the availability of land that has been UGK, the information is already 77%. This is actually new progress even though UGK has reached 77%, the availability of areas that can be worked on by contractor colleagues is 81.55%,” said President Director of PT Citra Marga Nusaphala Persada (CMNP) Tbk, Arief Budhy Hardono, as quoted from CMNP’s Instagram @official.cmnp, Sunday (23/8/2026).
The Harbour Road II Toll Road project requires an investment of Rp15.08 trillion, with construction projected to be completed in 2028. The Harbour Road II Toll Road is being built as a measure to alleviate traffic congestion on the Harbour Road I Toll Road and the heavy traffic load on the northern side of Jabodetabek.
In addition, the construction of the Harbour Road II Ancol Timur–Pluit Toll Road is expected to attract significant traffic from Tanjung Priok Port. Logistics connectivity that relies on Jalan Martadinata towards Pluit is expected to be relieved and to improve connectivity with Soekarno-Hatta Airport.
The Harbour Road II Ancol Timur–Pluit Toll Road project has a unique feature through its design and construction method that employs a multi-level elevated road structure. The 9.7 km toll road project is designed with a 2×3 lane configuration and a speed of 80 km per hour.
Advisory Board member of PT CMNP Tbk Jusuf Hamka said that this toll road is capable of withstanding the threat of earthquake disasters for up to 1,000 years. Not only that, the technology used for the construction of this project is 100 percent a domestic product.
“For me, this Harbour Road II is a long-held aspiration because it is elevated above the existing one. So if I may say, if it used to be single-decker, now it is double-decker. And ladies and gentlemen, I need to report that this is built by the nation’s own children without any foreigners, and the Director General may need to know that this also does not use the state budget. So hopefully we hard workers will continue to receive support from the government, especially from Bina Marga, BPJT, KSP. We will work well and God willing, our road’s earthquake resistance strength is not 100 years anymore, it is 1,000 years now, sir,” he explained.
Source: jawawa.id (https://jawawa.id/newsitem/indonesias-new-highest-elevated-toll-road-in-jakarta-earthquake-resistant-for-1-000-years-1787478714)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260823124858-4-761605/tol-layang-baru-tertinggi-di-ri-ada-di-jakarta-anti-gempa-1000-tahun), translated from Indonesian