Indonesian Political, Business & Finance News

Indonesia’s First Deep-Water Project Ready to Roll Off E. Kalimantan’s Coast

| Source: The Jakarta Globe

The Jakarta Globe By Tito Summa Siahaan

Jakarta: Indonesia’s oil and gas regulator, SKKMigas, announced on Tuesday that it has selected winners for engineering, procurement, construction and installation in the development of Jangkrik and Northeast Jangkrik natural gas fields.

Both fields are part of the Muara Bakau block, located off East Kalimantan’s coast. The announcement marks the country’s first real progress in its attempt to tap hydrocarbon reserves located in deep water.

The regulator had awarded at least three contracts for deepwater projects but real progress had been slow and Muara Bakau block was the only project that had seen significant progress. Italy’s Eni is the operator of the block with 55 percent interest, while France’s GDF Suez controls the remainder.

Tripatra Engineers and Constructors, Chiyoda International Indonesia, Hyundai Heavy Industries, a consortium of Technip Indonesia-Technip Geoproduction and FMC Santana Petroleum Equipment Indonesia are the winners for the $4.13 billion contract to develop the fields, the regulator’s chief Johannes Widjonarko said. SKKMigas estimates the development of fields to generate revenue of $5 billion for the state.

“Both fields are expected to commence production by early 2017 with peak output estimated at 450 million cubic feet of natural gas per day for six years,” Johannes said, adding that both fields had enough reserves to sustain production for 14 years.

Though there are no official definitions, deepwater is usually defined as reserve deposit located at more than 500 meters below sea level.

Johannes said that based on the plan of development, the operator had agreed to allocate 30 percent of the output from the fields for domestic consumption, but will attempt to increase the domestic allocation to 47 percent. “As long as it is economically viable and supported by infrastructure,” he added.

Other deepwater projects in the pipeline are the Inpex-operated Abadi Field and Chevron’s Indonesia Deepwater Development. Abadi is located in the Arafuru sea, located between Papua and Australia.

Indonesia has been looking to offshore projects to compensate for the rapidly declining output from aging onshore fields. But development of offshore — especially deepwater — project had been slowed as it typically costs more than onshore projects.

To compensate the expensive cost, companies had requested for the government to grant a more generous Production Sharing Contract by reducing its output share. Government’s take on gas output from blocks developed by private firms can be as high as 70 percent of the total.

More from 11 February 2014 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/indonesias-first-deep-water-project-ready-to-roll-off-e-kalimantans-coast-1392051600)
Originally published by The Jakarta Globe (http://www.thejakartaglobe.com/business/indonesias-first-deep-water-project-ready-to-roll/)
Print