Indonesian Ports Need to Work Faster
TEMPO Interactive by ANGGA SUKMA WIJAYA, MARIA YUNIAR & RR ARIYANI
Jakarta: The government is targeting to accelerate the process of loading and unloading containers at ports this year, one way is by shortening dwelling time to just four days.
Based on survey results, the average dwelling time at Tanjung Priok in 2011-2012 is around 4.7 to 6.7 days. The lengthy process is due to several factors including pre-customs clearance (58 percent), quarantine (18 percent), and post-customs clearance (24 percent).
Coordinating Minister for the Economy Hatta Rajasa said the government is trying to reduce the dwelling time at Tanjung Priok such as by applying auto-gate system at the Jakarta International Container Terminal (JICT) to increase service speed. The government is also preparing an integrated operation for physical examination (TPFT) at CDC banda and Graha Segara to physically inspect goods in an integrated manner to increase the speed of service.
"Also, the application of an integrated cargo release (I-Care) through the operation of cargo links at TPK Koja that electronically integrates all services related to unloading once receiving approval from Customs," he said.
Finance Minister Agus Martowarodojo said Indonesia has implemented the Indonesian National Single Window (INSW) since 2007 in Port of Tanjung Priok. There are 18 ministries and agencies or 21 institutions providing integrated services for export and import licenses. "So, there is no need to go to each agency," he asserted.
To date, Agus said, there are nine ports that have implemented the INSW system for 90 percent of foreign trade volume. He hopes that all importers can utilize the i-Care system to reduce dwelling time.
Source: jawawa.id (https://jawawa.id/newsitem/indonesian-ports-need-to-work-faster-1358787600)
Originally published by Tempo Interactive (http://www.tempointeractive.com/hg/nasional/2013/01/22/brk,20130122-456356,uk.html)