Indonesia Successfully Tests Oil Production at Akasia Maju Well, Flowing 410 Barrels
The Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas) has revealed that the Akasia Maju (AMJ)-005 development well, operated by PT Pertamina EP (PEP) Zone 7, has recorded positive results with a temporary initial production of 410.4 barrels of oil per day (BOPD).
SKK Migas Head Djoko Siswanto stated that drilling of the AMJ-005 well commenced on 22 June 2026. The well subsequently underwent a production test on 20 July 2026, achieving a temporary result of 410.4 BOPD.
“Alhamdulillah, PT Pertamina EP Asset 3 (PT PEP Zone 7) commenced drilling of the Akasia Maju AMJ-005 development well on 22 June 2026 and as of 20 July 2026 has successfully carried out a production test with a temporary result reaching 410.4 BOPD (choke with 7 mm bean),” Djoko said in a written statement on Wednesday (22/7/2026).
Djoko further explained that the well is located in the Akasia Maju Structure, West Java Province, with the main drilling target being the Upper Cibulakan Formation, layer F2.
According to Djoko, operationally, the well was drilled directionally (J-Type) using Rig PDSI #28.2/D1000-E (750 HP) to a final depth of 1,550 metres Measured Depth (mMD) or 1,390 metres True Vertical Depth (mTVD) in a total time of 29 days without any accidents.
“We ask for the support and prayers of everyone so that it can be put into production soon, Aamiin YRA,” he added.
Source: jawawa.id (https://jawawa.id/newsitem/indonesia-successfully-tests-oil-production-at-akasia-maju-well-flowing-410-barrels-1784717568)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260722154823-4-752959/terbaru-ri-berhasil-uji-produksi-minyak-sumur-akasia-maju-410-barel), translated from Indonesian