Indonesian Political, Business & Finance News

Indonesia Set to Miss Oil Output Goal

| Source: The Business Times

The Business Times (Malaysia)

JAKARTA: Indonesia may fail to meet its oil production target this year, the new chief of temporary oil and gas regulator SKMigas said this week.

In response to the prediction, Rudi Rubiandini said his office would seek to revise down the oil production target.

In the 2013 state budget, oil production is forecast at 900,000 barrels per day (bpd).

"So it (the target) will no longer be a fixed number, but will be set within the range of 850,000 barrels and 900,000 barrels per day," Rudi said on the sidelines of an SKMigas event here on Wednesday.

He added that the regulator would submit the proposal to the government and then bring it to the House of Representatives for approval.

Rudi said oil production currently stands at about 830,000 bpd.

The SKMigas chief also voiced a pessimistic view on the government's effort to once again produce one million bpd by 2014.

"Maybe there will be days when production reaches one million barrels, but for the annual average, I think it will be very difficult - maybe in 2015," Rudi said.

The ambitious target, he went on, depended largely on development of the Banyu Urip field in East Java, which is part of ExxonMobil Indonesia's Cepu block.

Banyu Urip field, said to hold the largest untapped oil reserves in Indonesia, is expected to produce 240,000 bpd.

The field is currently at the early stages of development, producing 24,000 bpd.

Indonesia's oil production reached its peak during the primary and secondary recovery periods between 1977 and 1995, with production reaching around 1.6 million bpd.

Production fell to one million bpd in 2003 and the continued decline eventually led the country to leave the Organisation of the Petroleum Exporting Countries in 2008.

The government is now turning to an expensive method called enhanced oil recovery, in which chemical fluids are injected into basins to extract more oil, while firms drill deeper in search of oil.

Rudi said both SKMigas and the government were formulating a new regulation that was expected to bring the implementation of enhanced oil recovery to a massive scale.

"Actually, Indonesia still has plenty of reserves left in the primary recovery," he said.

The regulation will lead to third-party involvement in the implementation of enhanced oil recovery on a "no cure, no pay" basis, meaning that no payment will be made should the expensive method fail to produce results, he added.

Rudi said the government had provided incentives for oil firms attempting to explore deep waters in eastern Indonesia.

"Ninety-five per cent of our production comes from western Indonesia. We want to encourage them to explore the eastern part."

More from 21 January 2013 โ†’

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/indonesia-set-to-miss-oil-output-goal-1358701200)
Originally published by The Business Times (http://www.btimes.com.my/articles/gerub2/Article/)
Print