IDR 1.3 Trillion BRT Project Begins, Targets Congestion-Free Greater Bandung by 2027
Bandung (ANTARA) - The government has officially begun construction of the Rp1.3 trillion Bus Rapid Transit (BRT) project for the Bandung Raya basin, equipped with a 21-kilometre dedicated lane and an artificial intelligence system, in a bid to end the congestion crisis in the region by 2027.
The modern mass transport project, which targets a maximum waiting time (headway) of seven minutes during peak hours, was marked by the groundbreaking of the Indonesia Mass Transit Project (MASTRAN) programme and the signing of the Public Service Obligation (PSO) subsidy commitment at Leuwipanjang Terminal, Bandung, on Wednesday.
Minister of Transport Dudy Purwagandhi, speaking at the groundbreaking site, affirmed that this step is the government’s fundamental solution to halt the waste of time and declining productivity of residents caused by increasingly severe traffic density in the Bandung Raya agglomeration.
“The solution we need is not merely adding road capacity; more important is the presence of a reliable, integrated public transport system that becomes the primary choice for people in their daily activities,” Dudy said.
Director General of Land Transport at the Ministry of Transport, Aan Suhanan, detailed that the Rp1.3 trillion investment in Bandung Raya will be used to build 21 km of sterilised lanes, six fleet depots (including Cicaheum, Leuwipanjang, Padalarang, Soreang, Cimenyan/Ciburuy, and Majalaya), 34 on-corridor stops, 719 off-corridor stops, and the procurement of an artificial intelligence system (Intelligent Transport System/ITS).
“Through infrastructure development and the implementation of ITS, the BRT Bandung Basin service is targeted to operate with a maximum headway of seven minutes during peak hours and 15 minutes during off-peak hours, so that people can enjoy public transport services that are more certain, fast, comfortable, and reliable,” Aan said.
“This is a joy for the people of Bandung Raya, including Sumedang. We hope the construction proceeds safely, smoothly, without disruption, and can produce high-quality development that can be used quickly,” Dedi added.
Source: jawawa.id (https://jawawa.id/newsitem/idr-1-3-trillion-brt-project-begins-targets-congestion-free-greater-bandung-by-2027-1784728605)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5661169/proyek-brt-rp13-triliun-dimulai-target-2027-bandung-raya-bebas-macet), translated from Indonesian