Indonesian Political, Business & Finance News

Hutama Karya Targets Completion of Musi V Bridge by End of 2026

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
Hutama Karya Targets Completion of Musi V Bridge by End of 2026
Image: Antara (Indonesian)

Palembang (ANTARA) - PT Hutama Karya is targeting the construction of the Musi V Bridge in Palembang, South Sumatra, to be completed and ready for use before the end of 2026.

“The construction of the Musi V Bridge in Palembang is a crucial part of the Kayu Agung-Palembang-Betung toll road section, or Kapalbetung, within the Trans-Sumatra Toll Road network,” said Dwi Aryono Bayuaji, Executive Vice President of Toll Road Development at PT Hutama Karya, in Palembang on Thursday.

He said that the Vice President of the Republic of Indonesia, Gibran Rakabuming Raka, today inspected the final progress of the Musi V Bridge construction in Palembang, South Sumatra.

The inspection was carried out to see first-hand the physical readiness of the bridge, which will become a new economic lifeline for Sumatra.

During the working visit, Vice President Gibran, accompanied by South Sumatra Governor Herman Deru and Palembang Mayor Ratu Dewa, inspected the main structure of the bridge, which has now been fully built and is undergoing a series of load tests before being opened to the public.

“Vice President Gibran was quite satisfied with the acceleration of construction,” he said.

Dwi explained that the overall progress of the Palembang-Betung toll road construction has already surpassed 90 per cent.

“Sections 1 and 2 are targeted to be fully completed by the end of this year. The Musi V Bridge has a total structure length, including approach roads, of about 1.8 km, with a main span reaching 380 metres,” he said.

Meanwhile, Palembang Mayor Ratu Dewa said the presence of the 69km Palembang-Betung toll road will slash travel times from the previous three hours via the national road to just one hour.

“On behalf of the Palembang city government, I feel proud of the presence of this infrastructure,” he said.

According to him, the Musi V Bridge is seen not only as a way to relieve urban congestion, but also as a new economic magnet for the residents of Palembang.

The reduction of travel times by up to 60 per cent will revolutionise logistics routes, as the distribution of food supplies and commodities can be carried out more quickly.

“The Palembang city government has also stated it is ready to fully support the acceleration of the toll road’s operation, particularly in terms of urban infrastructure integration,” he said.

More from 16 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/hutama-karya-targets-completion-of-musi-v-bridge-by-end-of-2026-1784192349)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5652060/hutama-karya-targetkan-pembangunan-jembatan-musi-v-rampung-akhir-2026), translated from Indonesian
Print