Indonesian Political, Business & Finance News

Head of Bappisus Ensures Oversight of Rp2.8 Trillion Greater Bogor Waste-to-Energy Project

| | Source: Media Indonesia Translated from Indonesian | Infrastructure
Head of Bappisus Ensures Oversight of Rp2.8 Trillion Greater Bogor Waste-to-Energy Project
Image: Media Indonesia

The Head of the Special Development Control and Investigation Agency (Bappisus), Aries Marsudiyanto, attended the inauguration of the construction of the Greater Bogor Waste-to-Energy (PSEL) 1 project at the Galuga Landfill area, Cibungbulang, Bogor Regency, West Java, on Thursday (17/9).

In his speech, Aries placed special emphasis on the use of the state budget in this strategic project. He warned that the entire construction process of the PSEL must be accountable, transparent, and precisely targeted.

“Every project requires funding. This project also absorbs Rp2.8 trillion. That is the people’s money; I ask every field, every department, and every line to ensure accountability, always prioritising service and sacrifice for the people. There must be no personal interests,” Aries stated firmly.

He also recalled a message from President Prabowo Subianto regarding the integrity of state apparatus in managing development. “The President also constantly conveys, reminds, urges, and advises us: cleanse ourselves before the state cleanses us,” he added.

Aries explained that President Prabowo’s current policy focuses on four fundamental pillars of national development: food and water, energy, technology, and the environment, where waste management plays a crucial role.

According to him, the Greater Bogor PSEL 1 is a breakthrough that synergises aspects of technology, energy, and the environment. Therefore, he requested strengthened coordination, communication, and collaboration between ministries and agencies (K/L) to overcome various bottlenecks that have occurred in the past.

“As the Head of BAPPISUS, I am here to synergise all ministries and agencies. I request all relevant agencies to always communicate, coordinate, and collaborate to ensure synergy and harmony. This is to create breakthroughs for issues that previously became bottlenecks. This is a serious national problem,” he said.

The construction of Greater Bogor PSEL 1 is expected to be a long-term solution for waste management in the Bogor area, while simultaneously supporting energy availability for the community. This facility is projected to reduce the burden on the Galuga landfill, lower carbon emissions, create new jobs, and provide a positive economic impact for the Greater Bogor region.

He explained that the Greater Bogor PSEL 1 will manage up to 1,500 tonnes of waste per day, converting it into electricity in the Galuga area and its surroundings.

More from 17 September 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/head-of-bappisus-ensures-oversight-of-rp2-8-trillion-greater-bogor-waste-to-energy-project-1789661131)
Originally published by Media Indonesia (https://mediaindonesia.com/humaniora/934657/kepala-bappisus-pastikan-kawal-proyek-psel-bogor-raya-senilai-rp28-triliun), translated from Indonesian
Print