Indonesian Political, Business & Finance News

Government Ensures All Trans-Flores Roads Functional Again After NTT Earthquake

| | Source: Republika Translated from Indonesian | Infrastructure
Government Ensures All Trans-Flores Roads Functional Again After NTT Earthquake
Image: Republika

The Ministry of Public Works (PU) has confirmed the acceleration of infrastructure recovery efforts following the 7.7 magnitude earthquake in East Nusa Tenggara (NTT). Minister of Public Works Dody Hanggodo has requested that regional governments promptly submit preliminary data and damage locations so that handling can be carried out quickly and accurately.

“This is important so that the Ministry of Public Works team can immediately go to the field, coordinate with regional governments, and conduct direct inspections of every affected location,” said Dody in a written statement in Jakarta on Monday (17/8/2026).

Dody emphasised that the Ministry of Public Works is ready to provide technical support and infrastructure handling, while regional governments will help determine priority locations. The Ministry of Public Works, through the NTT National Road Implementation Agency (BPJN), immediately deployed personnel and equipment to reopen access affected by landslides and road surface damage.

“We are present at every disaster, because the President’s directive is clear that we must not grieve for too long, we must rise again as quickly as possible,” said Dody.

Dody reported that nine national road sections suffered identified damage covering dozens of landslide points, road surface fractures, as well as damage to a number of bridges and culvert plates. As of 16 August 2026, he said, the nine affected road sections have been restored to functional status.

“Eight sections that are part of the Trans Flores route, from Labuan Bajo–Ende–Maumere, are now passable. Meanwhile, the Ruteng–Reo–Kedindi section has also been restored to functional status,” he stated.

In the temporary handling, he continued, 40 landslide points have been dealt with and restored to functional status. In addition, four road surface fracture points have also been addressed.

“The damage at five bridge and culvert plate points is currently still possible to be made functional so that public mobility can continue,” Dody added.

To accelerate handling in the field, Dody said, BPJN NTT has mobilised seven excavator units and four loader units to a number of affected locations. The equipment is being used to clear landslide material, address road surface damage, and ensure access to affected areas remains open.

“The restoration of the nine affected national road sections to functional status is an important step in the recovery of Flores Island following the earthquake,” said Dody.

More from 18 August 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/government-ensures-all-trans-flores-roads-functional-again-after-ntt-earthquake-1787017926)
Originally published by Republika (https://ekonomi.republika.co.id/berita/tjxyaz490/pemerintah-pastikan-seluruh-jalan-transflores-kembali-fungsional-pascagempa-di-ntt), translated from Indonesian
Print