Government Accelerates Development of 60,000 KL per Year Bioethanol Plant in Lampung
The government is accelerating the development of the national bioethanol industry as part of the strategy for plantation downstreaming and energy transition. One of the steps being taken is the development of an integrated bioethanol ecosystem in Lampung Province.
This commitment was emphasised during the Coordination Meeting and Field Visit for Integrated Bioethanol Development in Lampung. The activity was led by the Deputy Minister of Investment and Downstreaming/Deputy Head of BKPM, Todotua Pasaribu, and attended by various other stakeholders.
During the event, a joint declaration for the development of the bioethanol ecosystem in Lampung was signed. This agreement serves as the basis for cooperation in developing the raw material supply chain, constructing production facilities, strengthening agricultural partnerships, and accelerating investment.
This initiative follows government meetings with Toyota Motor Corporation and visits to bioethanol research facilities in Japan. Such cooperation opens opportunities for technology transfer and the strengthening of human resource capacity within the bioethanol sector.
Todotua stated that Lampung was selected as the initial development site due to its adequate availability of raw materials. Furthermore, the region holds a strategic position to supply energy needs in Sumatra and parts of Java.
“Lampung possesses the most capable feedstock for national bioethanol development. Its position is very strategic as it can supply the needs of Sumatra and parts of Java, which are the largest energy consumption centres in Indonesia,” said Todotua in his statement in Lampung on Wednesday, 10 June 2026.
During visits to Pesawaran and South Lampung Regencies, the government inspected areas projected to become integrated bioethanol development hubs. The inspection results indicated that Lampung has strong raw material potential, ranging from sugarcane molasses and sorghum to biomass waste.
The project is also expected to strengthen partnerships between industry and local farmers. The development of sorghum cultivation will serve as an additional raw material source to support national bioethanol production.
In the initial stage, the pilot project will include the planting of 10 hectares of Enryu variety sorghum and the construction of an early-scale bioethanol facility. Subsequently, at the commercial stage, 6,000 hectares of sorghum land will be developed alongside a bioethanol plant with a capacity of 60,000 kilolitres per year.
Construction is targeted to begin in the third quarter of 2027, with operations commencing in the fourth quarter of 2028. As a follow-up, the involved parties will accelerate the preparation of feasibility studies, project planning, sorghum cultivation development, and the finalisation of financing schemes.
“What we want to build is not just a factory, but an economic ecosystem. The feedstock is here, the logistics are here, and the agricultural community is also here,” he said.
He expressed hope that the project would benefit farmers, supporting industries, and the community. Additionally, the development of bioethanol in Lampung is expected to strengthen national energy security while supporting Indonesia’s downstreaming agenda.
Source: jawawa.id (https://jawawa.id/newsitem/government-accelerates-development-of-60-000-kl-per-year-bioethanol-plant-in-lampung-1781322612)
Originally published by rri.co.id (https://rri.co.id/ekonomi/makro/2489344/pemerintah-dorong-pengembangan-pabrik-bioetanol-60-ribu-kl-per-tahun-di-lampung), translated from Indonesian