Good News! Indonesia Successfully Adds 777 Barrels of Oil Production in South Sumatra
The Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas) has announced positive news regarding the drilling of an oil well by PT Pertamina EP Asset 2 (PT PHR Zona 4).
Head of SKK Migas, Djoko Siswanto, reported that PT Pertamina EP Asset 2 drilled the KRG-042 development well on 22 June 2026. "As of 16 July 2026, a production test using an ESP was successfully conducted with preliminary results reaching 777 barrels of oil per day (BOPD) in the TAF-E1 layer (interval 1481-1482 mMD)," he stated in a written release to CNBC Indonesia on Sunday (19/7/2026).
He detailed that the well’s production comes from the Layer E1 with good reservoir pressure. The drilling location is in the Karangan Structure, Limau Field, approximately 20 km southeast of Prabumulih City, South Sumatra.
The well was drilled directionally using the PDSI#25.2/LTO750-M rig to a final depth of 1697 mMD/1624.96 mTVD, completed in a total time of 25 days from a planned 28 days, without any accidents.
The estimated cost incurred, based on field estimates, was US$3,175,003.13, representing 76.15% of the approved AFE by SKK Migas. "Please pray that it can soon be recorded as lifting in the near future," he added.
Source: jawawa.id (https://jawawa.id/newsitem/good-news-indonesia-successfully-adds-777-barrels-of-oil-production-in-south-sumatra-1784436650)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260719085510-4-751925/kabar-baik-ri-berhasil-tambah-produksi-minyak-777-barel-di-sumsel), translated from Indonesian