Member of Commission XII of the Indonesian House of Representatives (DPR RI), Muhammad Rohid, alongside the environmental Law Enforcement (Gakkum) team, inspected eight plantation companies and palm oil mills in Kuantan Singingi Regency (Kuansing), Riau. Six companies have been temporarily closed after several issues regarding compliance with environmental protection and management regulations were discovered.

The six companies involved are PT MAS, PT TAL, PT KTBM, PT CRS-PKS II, PT SIM, and PT PCS. This inspection was carried out following community reports regarding alleged environmental pollution and company activities deemed to be disturbing the peace of local residents.

The inspection covered environmental documents, production capacity, wastewater management, hazardous and toxic waste (BPD) management, emissions, protection of river buffers, and the readiness of infrastructure for forest and land fire control.

Rohid emphasised that the supervision is being conducted to ensure companies operate according to regulations. The move is also intended to ensure that business activities do not harm the community or the environment.

“We are not cutting off people’s livelihoods, but we want these companies to improve so that their processes do not disturb the peace and comfort of the surrounding community. Therefore, these companies are being closed for the time being,” said Rohid following the inspection, as stated in his briefing on Sunday (4/10/2026).

During the activity, Rohid was accompanied by the Chairman of the Gerindra Party Kuansing Branch, who is also a member of the Kuansing Regional House of Representatives (DPRD), Reky Fitro, the Head of the Kuansing Environmental Office (DLH), Dodi Fitrawan, and other relevant officials.

Findings in Several Companies

The team discovered replanting of oil palm at PT KTBM that was reportedly not listed in the environmental documents. The team also found oil palm planting within the buffer zones of the Batang Pantai, Rukam, and Tiu Rivers, as well as on land stated to be outside the boundaries of the Cultivation Rights (HGU). The area of planting in the Batang Pantai and Rukam river buffers was recorded at approximately 7.41 hectares, while the Tiu river buffer area covered about 2.9 hectares. Additionally, approximately 1.76 hectares of planting were found outside the HGU boundaries.

The inspection also noted the existence of a drainage ditch measuring approximately 4,237 metres. Parts of this channel are reportedly located within river buffer zones and outside HGU boundaries, with discharge channels connected directly to water bodies.

Regarding forest fire prevention, the team noted that only four fire towers are available out of the required 21 units. A number of personal protective equipment (PPE) items and firefighting team supplies were also reported to be below the minimum requirements.

At PT TAL, the team noted that the factory’s installed capacity has reached 75 tonnes of fresh fruit bunches (FFB) per hour, whereas environmental documents specify a capacity of 60 tonnes per hour. The addition of a press machine was also reportedly not included in the environmental documents.

Regarding wastewater management, the team found that some channels were not watertight. Furthermore, three pipe units in pond 13 were identified as having the potential to be used for sudden wastewater discharge. The condition of the flowmeter was also reported as broken, while the compliance points or outlets were not equipped with signage or coordinates.

In terms of emissions, two furnace units were found that were not listed in the Technical Approval for Emissions. One part of a chimney was also reported to be leaking, creating the potential for emissions to be released without undergoing the proper treatment process.

Meanwhile, at PT CRS-PKS II, the team installed warning signs for Environmental Protection and Management Law Enforcement (PPLH) regarding administrative sanctions in the form of government compulsion issued by the Regent of Kuansing via Decision Number Kpts.33/I/2024 dated 22 January 2024. This sanction relates to the failure of Waste Water Treatment Plant (IPAL) pond 7, which has reportedly not been rectified. The team also noted several obligations in the RKL-RPL documents that have not been implemented, issues with boiler emission source coding, and discrepancies between boiler coordinates and field conditions. CRS also reportedly lacks Technical Approval for Meeting Emission Standards, and the permit for the temporary storage of hazardous waste (B3) expired in 2023, with the company currently undergoing the permit amendment process.

An inspection of PT SIM revealed issues in the management of exhaust gas from empty fruit bunch combustion. This gas was reportedly not directed to a water pond as specified in the UKL-UPL documents, but instead released directly into the environment. The company also failed to submit UKL-UPL implementation reports every six months to the Riau Provincial Environmental Office and the Ministry of Environment through the Electronic Environmental Reporting Information System (SIMPEL).

The team also noted that the use of wastewater for land application exceeds the prescribed dosage. Factory runoff was also reported to flow into drainage channels and subsequently into the Anak Sungai Lantak Payable without first passing through pollution control facilities such as oil traps. Furthermore, the use of wastewater through land application has not been included in the Environmental Approval.

At PT MAS, the team installed PPLH warning signs based on the inspection report. The company reportedly lacks the Operational Feasibility Certificate (SLO) for wastewater discharge and the SLO for meeting emission standards. The installed factory capacity was recorded at 45 tonnes of FFB per hour, while environmental documents specify 40 tonnes per hour. The inspection also found an additional boiler unit and two generators that were not listed in the environmental documents, despite having Technical Approval. Other findings included the failure to conduct testing for copper (Cu) and iron (Fe) parameters as required by Technical Approval, issues with cleanliness and organisation of the work area, ambient air, noise, and odour testing, as well as the management of temporary hazardous waste (B3) storage facilities.

More from 4 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/gerindra-legislator-and-law-enforcement-inspect-8-companies-in-kuansing-6-temporarily-closed-1791096951)
Originally published by detikcom (https://news.detik.com/berita/d-8691594/legislator-gerindra-gakkum-periksa-8-perusahaan-di-kuansing-6-ditutup-sementara), translated from Indonesian
Print