Indonesian Political, Business & Finance News

Freeport to Invest US$4 Billion in New Kucing Liar Mine, Production Targeted for 2029

| Source: CNBC Indonesia Translated from Indonesian | Mining
Freeport to Invest US$4 Billion in New Kucing Liar Mine, Production Targeted for 2029
Image: CNBC Indonesia

PT Freeport Indonesia (PTFI) is developing a new underground mine, Kucing Liar, which is targeted to begin operations in 2029. For its development, the company will add investment of up to US$4 billion, equivalent to Rp 71.2 trillion (assuming an exchange rate of Rp 17,802 per US dollar), through to 2033.

This was reported by Freeport-McMoRan (FCX) in its first-half 2026 company report. As of 30 June 2026, PTFI had already disbursed approximately US$1.4 billion, or around Rp 24.9 trillion, for the development of the Kucing Liar mine project.

PTFI began developing the new underground mine, located in the Grasberg area of Central Papua, in 2022. Initially, the mine was targeted to begin operations in 2028, but this was pushed back to 2029 due to a wet muck rush incident at the Grasberg Block Cave (GBC) in September 2025.

“Since 2022, PTFI has been carrying out long-term mine development activities at the Kucing Liar deposit located within the Grasberg minerals district,” the first-half 2026 performance report from Freeport-McMoRan (FCX) stated.

According to the FCX report, production from the Kucing Liar mine is targeted to begin ramping up gradually around 2030 until it reaches a design capacity of approximately 130,000 metric tonnes of ore per day.

At full operation, Kucing Liar is estimated to be capable of producing an average of 750 million pounds of copper and approximately 735,000 ounces of gold per year. This is considered one of the company’s strategies to maintain production sustainability in the Grasberg area.

Meanwhile, PT Freeport Indonesia President Director Tony Wenas said the company has made substantial investments for the development of the Kucing Liar mine project. At least US$1.4 billion has already been spent on developing the Kucing Liar mine.

“That (investment) is for development. So underground mine development,” Tony said in Jakarta.

The project, which is targeted to begin operations in 2029, is currently already in the development stage.

“Development, not preparation. To develop it, access must be opened and so forth, that is part of development,” he said.

More from 11 August 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/freeport-to-invest-us-4-billion-in-new-kucing-liar-mine-production-targeted-for-2029-1786427480)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260811101202-4-758175/garap-proyek-tambang-baru-freeport-bakal-kocek-rp-712-triliun), translated from Indonesian
Print