Flooding prompts East Jakarta residents to complain of blocked drainage channel leading to East Flood Canal
Jakarta (ANTARA) – Residents of Jalan Pendidikan III in Duren Sawit, East Jakarta, have complained that a drainage channel leading to the East Flood Canal (BKT) is blocked, potentially triggering floods during heavy rain.
“It’s been flooding into my house since 2pm and it’s still happening. The water was initially 10 centimetres deep; now it’s 20 centimetres,” said a local resident, Fafa, 17, in East Jakarta on Thursday.
She said this was not the first time the area had flooded. The problem was believed to stem from a drainage channel at the end of the road leading to the BKT that was not functioning properly.
“The water flow at the end of the road there has been blocked off towards the BKT because there is a lot of rubbish and residential waste,” she said.
As a result, water from the residential area cannot drain properly and overflows during heavy rain.
Fafa said she hoped local neighbourhood associations (RT and RW) would coordinate with the East Jakarta city administration to expedite repairs to the problematic drainage channel.
“We hope the RT/RW here can coordinate with the government so it can be fixed as soon as possible,” Fafa said.
Another resident, Fakhri, 34, voiced a similar complaint. He confirmed that the drainage channel from RW 014 to the BKT was heavily blocked.
He said the blockages caused rainwater levels to rise quickly and inundate the residential area when rainfall intensified.
He hoped the city administration would inspect the drainage channel in person and carry out repairs to restore the flow towards the BKT.
He said fixing the channel was an urgent need to address the recurring floods in their neighbourhood.
“We hope coordination between local community leaders and the East Jakarta city administration will be followed up promptly, so that floodwater no longer enters residents’ homes whenever it rains heavily,” Fakhri said.
Earlier, the East Jakarta city administration had stepped up the readiness of hundreds of personnel from various government agencies to deal with possible disasters during the rainy season.
The administration has also prepared staff, as well as supporting equipment and infrastructure for disaster response.
Disaster preparedness posts in every urban village, along with RW posts in areas prone to flooding and inundation, have been reactivated.
Source: jawawa.id (https://jawawa.id/newsitem/flooding-prompts-east-jakarta-residents-to-complain-of-blocked-drainage-channel-leading-to-east-flood-canal-1795697487)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5880771/picu-banjir-warga-jaktim-keluhkan-saluran-air-menuju-bkt-tersumbat), translated from Indonesian