Indonesian Political, Business & Finance News

El Niño Proven to Impact Indonesia, Electricity in Sulawesi Decreased by 650 MW

| Source: CNBC Indonesia Translated from Indonesian | Energy
El Niño Proven to Impact Indonesia, Electricity in Sulawesi Decreased by 650 MW
Image: CNBC Indonesia

The President Director of PT PLN (Persero), Darmawan Prasodero, has addressed the reduction in electricity supply in the Sulawesi region due to the impact of El Niño, which has caused droughts in several rivers. This is significant as much of the electricity in Sulawesi relies on Hydroelectric Power Plants (PLTA).

Darmawan explained that due to El Niño, the capacity of hydroelectric plants has decreased significantly. “For example, in South Sulawesi, there is a reduction of approximately 650 Megawatts (MW),” Darmawan stated on Tuesday (22/09/2026).

To mitigate this electricity shortage, PLN is immediately implementing changes and increasing supply through Solar Power Plants (PLTS) equipped with battery energy storage systems. This ensures that during the dry season, additional energy can be provided via solar power and battery storage.

As for other regions facing similar El Niño challenges, such as Kalimantan, the issues are being addressed one by one.

The Minister of Energy and Mineral Resources, Bahlil Lahadalia, acknowledged that El Niño has caused water levels to drop, particularly in rivers used for navigation, such as those in Papua and South Papua towards Asmat. “Water levels are decreasing, and as a result, electricity generation is not maximised. This is occurring in several regions that utilise hydroelectric plants. It is gradually being addressed; this is a condition we must manage,” Bahlil emphasised.

More from 22 September 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/el-nino-proven-to-impact-indonesia-electricity-in-sulawesi-decreased-by-650-mw-1790060109)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260922132531-4-769877/el-nino-terbukti-berdampak-ke-ri-listrik-di-sulawesi-berkurang-650-mw), translated from Indonesian
Print