Eid Return Traffic: One-Way from Kalikangkung Toll Gate KM 414 in Effect
PT Jasamarga Transjawa Tol, together with the police, is adjusting traffic engineering to anticipate the increased volume of vehicles during the Eid al-Fitr 1447H/2026 return flow period on the Trans Java Toll Road section. At the discretion of the police, traffic engineering in the form of a local one-way from KM 425+800 on the Semarang Toll Road Sections A, B, C to KM 414 Toll Gate (GT) Kalikangkung on the Batang-Semarang Toll Road section will be implemented on Wednesday (25/03) at 11.55 WIB. At the same time, adjustments to the traffic engineering scheme are being made on the Trans Java toll road, where from KM 414 GT Kalikangkung Batang-Semarang Toll Road to KM 263 Pejagan-Pemalang Toll Road, traffic is normal in both directions. Meanwhile, from KM 263 Pejagan-Pemalang Toll Road to KM 70 GT Cikampek Utara Jakarta-Cikampek Toll Road, one-way traffic engineering is still in place. Vice President Corporate Secretary & Legal of PT Jasamarga Transjawa Tol, Ria Marlinda Paallo, stated that the traffic engineering adjustments are carried out dynamically following the on-site traffic conditions. “These traffic engineering adjustments are carried out situationally at the discretion of the police, taking into account the on-site traffic conditions. JTT, together with the police, continues to monitor to ensure that vehicle flow can be distributed well so that the journey of road users remains smooth and safe,” said Ria in her statement on Wednesday, 25 March 2026. JTT urges all Trans Java toll road users to prioritise safety in driving, ensure the condition of the driver and vehicle is in top shape, maintain a safe distance, and ensure sufficient electronic money balance before travelling. Road users are also expected to follow the instructions of on-site officers and the applicable traffic signs.