DPD Speaker Urges Accelerated Waste-to-Energy to Prevent Future Landfill Fires
Jakarta (ANTARA) - DPD RI Speaker Sultan Bachiar Najamudin is pushing for the acceleration of waste management through waste-to-energy (WTE) mechanisms to prevent the recurrence of landfill fires like the one at the Jatiwaringin final disposal site in Tangerang Regency. Speaking at the parliament complex in Senayan, Jakarta, on Wednesday, Sultan said waste management must be directed not only at reducing accumulation but also at producing useful energy. Waste-to-Energy (WTE) is a process of converting waste into useful energy, such as electricity, heat, or fuel. This method not only helps reduce the volume of waste piling up in landfills but also generates renewable resources to support energy needs. “Waste management should not just be about processing, but rather how waste that has perhaps been ineffective, unmanaged, or even harmful can be converted into energy,” he said. “I have also discussed waste-to-energy several times with Danantara. It should have started this year, if I am not mistaken, with five large waste-to-energy pilot projects,” he added. Furthermore, Sultan said the DPD RI is preparing a revision of Law Number 18 of 2008 on Waste Management and optimising its oversight function to ensure similar incidents do not recur. “We certainly take our role as parliament or the DPD, in accordance with our duties, which is to carry out the oversight function to ensure that the impact does not spread further,” he said. Meanwhile, the National Disaster Mitigation Agency (BNPB) recorded that 102 residents have been displaced due to smoke billowing from the burning waste material. BNPB Director of Emergency Operations Control Coordination, Brigadier General TNI Djohan Darmawan, said the extinguishing process had reached approximately 50 per cent of the total affected area of 18 hectares as of Tuesday (7/7). “Yesterday, I reported 45 per cent. And currently, almost 50 per cent of the fire area is under control because we have targeted the western side of the Jatiwaringin landfill,” said Djohan.
Source: jawawa.id (https://jawawa.id/newsitem/dpd-speaker-urges-accelerated-waste-to-energy-to-prevent-future-landfill-fires-1783497881)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5640353/ketua-dpd-dorong-percepatan-wte-cegah-kebakaran-tpa-terulang), translated from Indonesian