DKI Jakarta Government targets completion of 20 flood control projects by 2027
The DKI Jakarta Provincial Government aims to complete 20 flood control projects across the capital by 2027.
Head of Jakarta’s Water Resources Agency (SDA), Ika Agustin, stated that the accelerated construction is in response to rising extreme rainfall in recent years.
“In recent years, climate change has led to higher and more extreme rainfall, ranging from 150 to 250 millimetres,” Ika said in Jakarta on Friday.
She added that current flood control infrastructure typically can only accommodate rainfall of 100 to 150 millimetres.
This has frequently caused flooding in several areas during extreme downpours.
This has prompted the Jakarta government to enhance flood control systems across various sectors, particularly pumping stations.
Agustin detailed key projects, including the construction and upgrade of pumping systems at 12 locations across Jakarta.
These include Bulak Cabe Pump with a capacity of 24 cubic metres per second, Pegangsaan Dua Pump at 9 cubic metres per second, and Cilincing KBN Pump at 16 cubic metres per second.
“Existing pumps at Ancol and IKIP will also see capacity upgrades,” she said.
Further, the agency is working on constructing and repairing nine river and canal facilities, including the Layar Connection Channel, Old Cakung River, Jatikramat River, Angke River, Pesanggrahan River, Grogol River, Cideng Atas River, Sekretaris Diversion Channel, and Tomang Reservoir.
To reduce rainwater runoff, the Jakarta government is building three new reservoirs: Pondok Labu Reservoir in Cilandak Marinir, Kebagusan Reservoir, and Sunter Hulu Reservoir.
River normalisation remains a priority, with three key sites being addressed this year: Ciliwung River, Krukut River, and Old Cakung River.
Additionally, the Jakarta government is continuing the National Capital Integrated Coastal Development (NCICD) coastal protection project in Mutiara Beach, Muara Baru, and Blencong River areas.
Source: jawawa.id (https://jawawa.id/newsitem/dki-jakarta-government-targets-completion-of-20-flood-control-projects-by-2027-1780040232)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5586255/pemprov-dki-targetkan-20-proyek-pengendali-banjir-rampung-pada-2027), translated from Indonesian