Denpasar Races to Normalise 40 River Sites, Allocating Rp14 Billion
Denpasar City Government has allocated Rp14 billion to remove sediment from 40 river and drainage locations. The work, overseen by the Public Works and Spatial Planning Agency (PUPR), is targeted for completion by the end of 2026.
Denpasar Mayor I Gusti Ngurah Jaya Negara inspected the normalisation work at Tukad Rangda in Panjer, Denpasar, on Saturday (7 November 2026). The visit was intended to ensure the work was proceeding according to plan and that the budget was being used appropriately.
“This is part of my monitoring of the use of the Rp14 billion budget across 40 locations,” he said.
Denpasar’s PUPR Agency is currently addressing sediment build-up at around 40 river and drainage locations. These include Tukad Badung, Tukad Teba, Tukad Punggawa, Tukad Loloan, Tukad Mati, Tukad Rangda, Tukad Ngenjung and Tukad Ayung.
For work on Tukad Mati, Denpasar City Government has also previously partnered with the River Basin Organisation (BWS).
Jaya Negara acknowledged that normalisation at several locations was taking time because heavy equipment had to be moved from one river to another. As a result, some locations, including Tukad Pekasih, had not yet received attention.
In addition to constraints on the allocation of heavy equipment, some rivers are difficult to reach because their access points are narrow.
“This is because the equipment has to be shared. There are also rivers that the machinery cannot enter because the access point is too narrow,” he said.
Despite these challenges, Jaya Negara said he expected all the normalisation work to be completed by the end of the year. He hoped similar work could begin earlier in future so that it did not pile up towards year-end.
“The target is for everything to be cleared by the end of the year. But looking ahead, and based on the feedback we have received, it should be completed before September,” he said.
He said this year’s normalisation work would also serve as an evaluation for Denpasar City Government, particularly the PUPR Agency, to help ensure similar projects are carried out more quickly.
In addition to river normalisation, Denpasar City Government is preparing to install a pump unit in the Bumi Ayu area. The pump will help channel water from low-lying areas into drainage channels connected to the sea.
“God willing, we will install a unit in Bumi Ayu. A pump machine has already been installed. Bumi Ayu is like a frying pan, so we are putting a pump at the lowest point. We will channel the water into a drain that carries it to the sea,” he said.
Jaya Negara also urged residents not to dump rubbish in rivers. He said normalisation efforts would not be effective without public support to keep waterways clean.
“We also ask Denpasar residents not to throw rubbish into rivers. Look at this: there is so much rubbish. No matter how hard we work, without everyone’s cooperation the government will inevitably struggle,” he said.
Source: jawawa.id (https://jawawa.id/newsitem/denpasar-races-to-normalise-40-river-sites-allocating-rp14-billion-1794045021)
Originally published by detikBali (https://www.detik.com/bali/berita/d-8742402/denpasar-kebut-normalisasi-40-titik-sungai-anggarkan-rp-14-miliar), translated from Indonesian