Death Toll from M 7.7 Flores Earthquake Rises to 53
The death toll from the magnitude 7.7 earthquake in Flores, East Nusa Tenggara, has risen to 53 people. Meanwhile, the number of injured has reached 110. The earthquake, centred in Nagekeo, has affected a total of 3,839 people, including those who have been displaced.
The Nagekeo Regency Government stated that the data is still being verified and will continue to be updated based on field assessments.
“Limited communications and fuel have been our main obstacles since Saturday,” said Nagekeo Deputy Regent Gonzalo Gratianus Muga Sada in a press release received by detikBali on Sunday afternoon (16/8/2026).
Gonzalo explained that the electricity supply in Nagekeo was completely paralysed after the earthquake, and telecommunications networks could only be accessed at around 18.00 WITA on the same day.
“Fuel shortages are also hampering the mobility of the government, officials, and the public in disaster management,” said Gonzalo.
In addition to the fatalities, the earthquake also damaged residents’ homes. Specifically, 159 houses suffered severe damage, 47 moderate damage, and 167 light damage. Damage also occurred to 36 educational facilities, 211 health facilities, 11 public facilities, 5 places of worship, and 6 office buildings,” he explained.
Coordinating Minister for Human Development and Culture Pratikno, in a Coordination Meeting on Flores Earthquake Management, said the government has agreed on a number of strategic measures. All affected regencies have been asked to immediately declare a state of emergency and activate disaster management posts led by the regent together with the Regional Leadership Coordination Forum.
“At the national level, National Assistance Posts have been established in Labuan Bajo and Maumere. Ministry and agency officials will join according to their duties and functions to strengthen coordination,” said Pratikno in the coordination meeting held in West Manggarai.
The Head of Basarnas has also been asked to coordinate the search and rescue task force because there are still residents who have not been found. The government has designated the first seven days of the emergency response period as a critical phase to accelerate the search for victims and ensure basic needs are met.
“All elements must work in an integrated manner. The large force deployed will only be effective if everyone works in sync,” Pratikno stressed.
To facilitate the distribution of aid, the government has prepared a National Logistics Post in Halim as well as distribution posts at Labuan Bajo Airport and Maumere Airport.
These three points will serve as the main routes for distributing aid from the government, ministries and agencies, businesses, and the public. BNPB has assured that the response will be carried out to the maximum extent by deploying all available forces and resources.
Source: jawawa.id (https://jawawa.id/newsitem/death-toll-from-m-7-7-flores-earthquake-rises-to-53-1786881050)
Originally published by detikBali (https://www.detik.com/bali/nusra/d-8621398/korban-tewas-gempa-m-7-7-di-flores-bertambah-jadi-53-orang), translated from Indonesian