Indonesian Political, Business & Finance News

Daop 2 train operations return to normal after Pangandaran earthquake, delays of 9-60 minutes

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
Daop 2 train operations return to normal after Pangandaran earthquake, delays of 9-60 minutes
Image: Antara (Indonesian)

PT KAI Daerah Operasi (Daop) 2 Bandung has announced that train services have returned to normal operation following a comprehensive inspection of railway infrastructure after the Pangandaran earthquake on Thursday evening (6/8), although some trains are still experiencing delays of between 9 and 60 minutes.

Daop 2 has confirmed that the entire railway infrastructure network is safe, with detailed inspections involving infrastructure officers along the rail lines, bridges, tunnels, switches, and signalling systems confirming that no structural damage or operational infrastructure disruptions were found.

KAI Daop 2 Bandung Public Relations Manager Kuswardojo stated in Bandung on Thursday that the temporary suspension (extraordinary stop) imposed on Wednesday evening (5/8) was a non-negotiable standard operational safety procedure.

“Safety is KAI’s top priority. After the earthquake occurred, all infrastructure officers moved quickly to conduct a thorough inspection of all operational assets. The results showed that all infrastructure, including rail lines, bridges, tunnels, and train operational infrastructure, was declared safe and no damage was found,” he explained.

The rapid response in the field succeeded in minimising the impact of train delays, keeping schedule disruptions within a range of 9 to 60 minutes.

Eight train services were temporarily held, with delay durations as follows:

KA (306) Parcel Selatan: 9 minutes

KA (292) Kutojaya Selatan: 22 minutes

KA (PLB 287A) Serayu: 24 minutes

KA (PLB 80B) Lodaya: 26 minutes

KA (72) Mutiara Selatan: 29 minutes

KA (274) Kahuripan: 29 minutes

KA (350) Commuter Line Garut: 38 minutes

KA (300) Cikuray: 60 minutes

“We apologise for the inconvenience experienced by our customers. The temporary suspension of services was carried out as part of KAI’s responsibility to ensure that all infrastructure is truly safe before trains are operated again. The safety of customers and train journeys cannot be compromised,” said Kuswardojo.

More from 6 August 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/daop-2-train-operations-return-to-normal-after-pangandaran-earthquake-delays-of-9-60-minutes-1785995898)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5682187/operasi-kereta-daop-2-kemabli-normal-pascagempa-walau-telat-9-60-menit), translated from Indonesian
Print