Construction of Bantar Gebang Waste-to-Energy Facility Begins: A Project Profile
Danantara Indonesia, through PT Danantara Investment Management (DIM) and PT Daya Energi Bersih Nusantara (Denera), has inaugurated the construction of the Bekasi City Waste-to-Energy (PSEL) facility in Ciketing Udik, Bantar Gebang, Bekasi City, West Java. Chief Investment Officer (CIO) of Danantara Indonesia Pandu Sjahrir said the inauguration of this second PSEL construction is part of Danantara Indonesia’s efforts to carry out the mandate of urban waste management through environmentally friendly technology as stipulated in Presidential Regulation Number 109 of 2025.
“The facility in Bekasi City is the second project to begin construction after the commencement of the Denpasar Raya PSEL in July 2026,” said Pandu at the inauguration of the Bekasi City PSEL construction on Wednesday (26/8/2026).
Pandu said Bekasi City plays an important role in the waste management system of the densely populated Jabodetabek area. With the condition of the Final Disposal Site (TPA) in Bekasi City having exceeded its capacity, Pandu noted the need for sustainable waste management alternatives.
“In addition, Bekasi City also has land readiness and a commitment to an adequate waste supply volume for the PSEL facility,” said Pandu.
For Pandu, the inauguration of this PSEL construction marks the presence of a real solution to address the waste emergency challenge in Indonesia, particularly in Bekasi City. Pandu hopes the Bekasi City PSEL can also create environmental, energy, and economic value for the surrounding community.
“This initiative is expected to generate nearly 1,000 green jobs and provide clean energy for tens of thousands of households,” Pandu continued.
As part of the Bekasi City PSEL inauguration, a Power Purchase Agreement (PPA) was also signed with PT PLN (Persero). Pandu explained that this agreement serves as the commercial foundation for the absorption of electricity generated from the Bekasi City PSEL facility into the PLN grid, thereby providing offtake certainty and long-term operational sustainability for the project.
“Following the Denpasar Raya PSEL, the Bekasi City PSEL has also obtained the Environmental Impact Analysis (AMDAL) document,” Pandu revealed.
Pandu said the Ministry of Environment (KLH) handed over the AMDAL document to Bekasi Environment Nusantara as the Business Entity for Development and Management (BUPP) of the Bekasi PSEL on Monday, 24 August 2026. Pandu noted that the preparation of the AMDAL for the Bekasi City PSEL project was carried out transparently through a comprehensive study of every environmental impact risk.
“The issuance of the AMDAL is one of the important milestones for the project entering the construction phase, and is a form of Danantara Indonesia’s commitment to meeting the highest governance standards on every project,” he added.
Pandu targets the Bekasi City PSEL to operate by mid-2028. Based on Presidential Regulation No. 109 of 2025, the electricity generated will be purchased and distributed to PLN. Power Purchase Agreements (PPA) will be established between PLN and each BUPP of all PSELs at a purchase price of USD 0.20 per kWh for all capacities.
“The facility in Bekasi City will process up to 1,500 tonnes of waste per day into clean energy in the form of electricity,” Pandu continued.
Pandu said the PSEL project managed by Denera will use moving grate incinerator technology with an Air Pollution Control System (APCS), an environmentally friendly incinerator with minimal emissions. Pandu said the selection of this technology has been adapted to the characteristics of Indonesian waste and can significantly reduce waste volume in a short time.
Pandu explained that the technology is designed with compliance standards for the European Union Industrial Emissions Directive (EU IED), the strictest environmental standard reference in the world. Pandu said the Bekasi PSEL will synergise with Pyrolysis waste management technology, where accumulated waste can be processed into renewable energy in the form of fuel oil.
“The separate Pyrolysis waste management project is managed by the Indonesian Army,” said Pandu.
Source: jawawa.id (https://jawawa.id/newsitem/construction-of-bantar-gebang-waste-to-energy-facility-begins-a-project-profile-1787745225)
Originally published by Republika (https://esgnow.republika.co.id/berita/tkdhfx490/pembangunan-psel-di-bantar-gebang-dimulai-ini-profil-proyeknya), translated from Indonesian