Consortium Brings in International Partners for Monorail
The Jakarta Post
Corry Elyda, Jakarta
photo: All smiles: Jakarta Governor Joko Widodo (center) is flanked by Coordinating Economic Minister Hatta Rajasa (left) and Ortus Holdings chairman Edward S. Soeryadjaya after the signing agreement at the City Hall on Saturday on the city’s monorail construction. (JP/Jerry Adiguna)
Consortium PT Jakarta Monorail (JM) signed on Saturday a participation agreement with its international partners and the city administration, taking another step closer to the start of the long-awaited project.
Edward Soeryadjaya, chairman of Ortus Holdings Ltd, JM’s majority shareholder, said the signing ceremony at City Hall marked the commencement of the monorail project.
“We are grateful to the Jakarta administration and our international partners for the opportunity to proceed with the project,” he said.
JM partners at the signing ceremony included Thailand’s Bangkok Mass Transportation System PCL; Singapore Technology Electronics Ltd and SMRT International Pte Ltd of Singapore; Indonesia’s PT Indosat; China’s Changchun Railways Vehicles Co Ltd and China Communications Construction Company Ltd, and Germany’s TUV Rhineland Group.
Besides its partners, several senior officials also attended the ceremony, including Jakarta Governor Joko “Jokowi” Widodo and Coordinating Economic Minister Hatta Rajasa, who is also chairman of the Committee for Infrastructure Development Policy (KKPPI), as well as ambassadors of the project’s partner countries.
After months of assessment, Jokowi eventually gave the green light for the resumption of the monorail project, which had been stalled since 2008 because of financial problems.
Ortus Holdings director Banyu Biru Djarot said that after the signing, JM would conduct a feasibility study to determine the most suitable method to develop and implement the project.
JM’s technical director, R. Bovanantoo, said his company needed to reexamine the monorail modeling and passenger demands as they had significantly changed since the last review in 2007.
Banyu said the company would spend approximately three months on the study before the ground breaking. He also confirmed that the company had secured the necessary funding to commence the Rp 8.1 trillion (US$800 million) project.
“We wouldn’t be here today if we still had financial issues,” he said.
The consortium is proposing to build two lines: a green line, with 16 stations, extending 14.27 kilometers from Komdak (the city police headquarters) to Satria Mandala Museum, both in South Jakarta; and a blue line stretching 9.72 km from Kampung Melayu in East Jakarta to Roxy in West Jakarta, with 11 stations.
JM plans to operate 10 trains comprising six cars each on the two lines by 2016, with each train capable of carrying 1,220 passengers. The monorail is expected to transport between 300,000 and 800,000 passengers per day with tickets costing around Rp 10,000 per trip.
Jokowi told reporters after the ceremony that he urged JM to begin construction as soon as possible.
“I hope they can finish it [the project] in less than three years,” he said, adding that the minor problems that still lingered could be solved along the way.
He also said he wanted all mass transportation projects like the mass rapid transit (MRT) and other monorail projects led by consortiums of state-owned firms to be completed quickly.
“Traffic congestion in the city is worsening by the day. These projects have to be executed, no matter what happens,” he said.
Jokowi said he had also asked the Jakarta Transportation Agency to prepare plans to anticipate gridlock during the construction period.
“The agency will create a simulation to examine what kind of traffic management system we can use to mitigate heavy traffic due to the construction work,” he said.
Source: jawawa.id (https://jawawa.id/newsitem/consortium-brings-in-international-partners-for-monorail-1372525200)
Originally published by The Jakarta Post (http://www.thejakartapost.com/news/2013/06/30/consortium-brings-int-l-partners-monorail.html)