Central Java–DIY Road Agency Reviews Kelok 23 Trial to Strengthen Safety
Yogyakarta (ANTARA) – The Central Java–Special Region of Yogyakarta (DIY) National Road Implementation Agency (BBPJN) has conducted a comprehensive evaluation following the trial opening of Kelok 23, also known as the new Kretek–Girijati Road, to strengthen safety before the route opens fully.
Tisara Sita, head of the National Road Implementation Task Force for DIY Province, said in Yogyakarta on Friday that the evaluation involved the DIY Police Traffic Directorate, the Class II DIY Land Transport Management Agency (BPTD), the DIY Transportation Agency, the DIY Public Works, Housing, Energy and Mineral Resources Agency, the Bantul Regency Government, Bapperida, the Civil Service Police Unit, police representatives and relevant contractors.
“The strong enthusiasm among visitors also indicates that this new road has the potential to support connectivity and tourism-area development in southern DIY,” Tisara said in a statement.
She said that enthusiasm needed to be matched by improved road safety and traffic discipline, as some visitors had stopped on the road shoulder to enjoy the view and take photographs, while illegal parking had also taken place.
“There are also street vendors along the road, as well as road users whose behaviour does not fully take safety into account,” she said.
The evaluation also recommended installing traffic lights at Kretek Junction, where Parangtritis Road meets the Southern Cross Route (JJLS), to manage vehicle flows and reduce the risk of traffic conflicts at the junction.
“Additional signs and advisory boards are also needed, along with organised parking, controls on trading within the road reserve, and improvements to road-safety facilities at several locations,” she said.
Tisara said further work remained on Lot 17A, including reducing the gradient on the continuation of the Lot 17 section, building a rest area and plans to widen the Kretek–Grogol section to four lanes.
“The condition of road and slope drainage, as well as the slope structures, also needs to be monitored, particularly after one rainy season, to ensure the construction continues to meet safety and security requirements,” she said.
As some construction and technical and non-technical preparations remained incomplete, the route has been closed again until all infrastructure is ready for its full opening.
The road has been fully closed using movable concrete barriers (MCBs), gates and safety fencing.
“This temporary closure is a preventive measure to ensure that all safety requirements and infrastructure preparations are fully met,” she said.
She said follow-up priorities included installing traffic lights at Kretek Junction in accordance with applicable rules and authorities, adding signs and advisory boards, controlling parking and street vendors, improving environmental cleanliness, and inspecting drainage and slopes after one rainy season.
A post-opening Road Safety Audit (AKJ) will also be coordinated with the relevant directorate at the Directorate General of Highways.
“The construction of the new Kretek–Girijati Road is part of efforts to improve connectivity in southern Yogyakarta,” she said.
Source: jawawa.id (https://jawawa.id/newsitem/central-java-diy-road-agency-reviews-kelok-23-trial-to-strengthen-safety-1793955174)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5836475/bbpjn-jateng-diy-evaluasi-uji-coba-kelok-23-guna-penguatan-keselamatan), translated from Indonesian