CATL Begins Production Trials for Battery Cells in Hungary
Debrecen, Hungary — CATL began production trials on 22 September 2026 at its newly built battery cell factory in Debrecen after all requirements were met. The trial aims to prepare, optimise, and validate production equipment and manufacturing processes before mass production commences. CATL Debrecen continues to work and coordinate with the government and local authorities to ensure high standards regarding the environment, health, and employee safety are maintained.
CATL announced the construction of its second battery factory in Europe, located in Debrecen, in August 2022. This plant integrates CATL into the European automotive and electric mobility supply chain, meeting the needs of leading automotive manufacturers in Europe. Construction of the first cell production building began in the summer of 2023. By the spring of 2026, the building had been equipped with the latest advanced technology. After obtaining the building use permit in August 2026, CATL secured all necessary permits and met all requirements under IPPC regulations before starting trials on 22 September across the first two production lines of the battery cell manufacturing facility.
Prior to the issuance of the building use permit, the Hajdú-Bihar County Government Office conducted regular on-site inspections of the CATL facility to follow up on several previous issues that had caused serious concern among local residents. Authority representatives confirmed that the company has completed all requirements that were previously lacking in the licensing process.
As a strategic manufacturing hub, the CATL plant in Debrecen will supply batteries to leading automotive manufacturers in Europe who have significantly expanded their electric vehicle production capacity in Hungary in recent years. As a global technology leader, CATL is implementing advanced and flexible production lines in Debrecen to meet customer needs. CATL has been producing battery modules in Debrecen since the autumn of 2024 and has produced 537,000 modules to date. Once all facilities are ready, the Hungarian plant will become CATL’s largest manufacturing base outside of China, with a capacity of 100 GWh.
Having obtained the necessary permits and met various requirements to begin these trials, CATL Debrecen will continue to cooperate with the government and local authorities to ensure employee health and safety. During the trial period, the company will also thoroughly monitor employee health and safety conditions as well as environmental factors, and will proactively report monitoring results to the authorities. CATL’s investment impacts not only Debrecen and its surrounding regions but also plays a vital role in the Hungarian economy and the European electric mobility supply chain. CATL also reaffirmed its commitment to transparency and is providing access for authorities to visit the company’s facilities at any time.
Source: jawawa.id (https://jawawa.id/newsitem/catl-begins-production-trials-for-battery-cells-in-hungary-1790226446)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5755997/catl-mulai-uji-coba-produksi-sel-baterai-di-hungaria), translated from Indonesian