Cabinet Secretary and KAI CEO Inspect Construction of Housing for Residents Along Senen Railway Tracks
Jakarta (ANTARA) - Cabinet Secretary Teddy Indra Wijaya, along with PT Kereta Api Indonesia (KAI) President Director Bobby Rasyidin, inspected the progress of housing construction for residents living along the railway tracks in the Pasar Senen area, Central Jakarta, on Saturday.
“This morning, Saturday, 25 April 2026, I, together with PT Kereta Api Indonesia President Director Mr Bobby Rasyidin, rechecked the progress of housing construction for the residents’ living spaces along the tracks near Pasar Senen Station,” Teddy said when confirmed by ANTARA in Jakarta on Saturday.
Teddy stated that the inspection was conducted to ensure the progress of housing construction for residents who have been living right on the edge of those railway tracks, about 2 kilometres from the capital’s centre.
The new housing is being built in accordance with President Prabowo Subianto’s directives to provide decent and comfortable living spaces for the community that has lived without proper shelter for decades, and lacks adequate clean water and bathing, washing, and toilet (MCK) facilities.
The location of the new housing is about 500 metres from the Pasar Senen railway tracks and is equipped with housing facilities, MCK, clean water, places of worship, children’s play areas, and other supporting facilities.
Teddy said the housing construction is being carried out quickly through cooperation between the Ministry of Housing and Settlement Areas and several related state-owned enterprises (BUMNs).
“The construction is being carried out quickly, thanks to close cooperation between the Ministry of Housing and several related BUMNs,” he said.
Teddy added that improving settlements to be more decent will also be carried out in other places gradually and periodically.
“Improving settlements to be more decent will also be carried out in other places gradually and periodically,” he stated.
Housing and Settlement Areas Minister Maruarar Sirait previously stated that the construction of housing for residents living along the Senen railway tracks in Jakarta is scheduled to be completed on 15 June 2026.
She said that, on President Prabowo’s instructions, the construction of 324 units of apartments or rusun in the Senen area has begun.
In addition, PT Kereta Api Indonesia (KAI) has also prepared around 500 housing units in the Kramat area, Jakarta.
“The one in Senen will be completed on 15 June. That means in two months, 15 June 2026,” said Ara, the familiar name for Maruarar Sirait, at the Presidential Palace Complex in Jakarta on Monday (6/4).
She added that the total housing construction for residents living along the tracks reaches 824 units.
Source: jawawa.id (https://jawawa.id/newsitem/cabinet-secretary-and-kai-ceo-inspect-construction-of-housing-for-residents-along-senen-railway-tracks-1777103456)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5542037/seskab-dan-dirut-kai-tinjau-pembangunan-hunian-warga-pinggir-rel-senen), translated from Indonesian