Buol Regency prepares environmental impact assessment for 118.4-kilometre Kotanagaya–Boilan road
Buol (ANTARA) – The Buol Regency Government in Central Sulawesi has begun preparing an Environmental Impact Assessment (AMDAL) to ensure that the construction and upgrading of the 118.4-kilometre Kotanagaya–Boilan road does not damage the local ecosystem.
Buol Public Works and Spatial Planning Agency head Darsat said in Biau on Sunday that preparing the AMDAL was an important step in ensuring the project took environmental and sustainability considerations into account.
“One crucial requirement is an ecological study, because infrastructure projects of this scale are subject to a mandatory AMDAL, particularly as the proposed road alignment is expected to cross a forest area,” Darsat said.
He said the assessment was important to anticipate potential environmental impacts, including declining air quality, increased noise, erosion and sedimentation, changes to water flows, and changes in land cover along the construction corridor.
“The 118.4-kilometre Kotanagaya–Boilan road is a cross-regional route connecting Parigi Moutong, Buol and Tolitoli regencies,” he said.
According to a 2009 feasibility study and schematic design, the road is planned as a collector road with a design speed of 40 kilometres per hour.
“The plans include a six-metre-wide paved carriageway with two-metre shoulders on each side, a drainage system, and 38 bridges with a combined length of about 848 metres. The project will also include box culverts and drains to help manage water flows,” he said.
Darsat said the road was expected to benefit residents by improving regional connectivity and accessibility, creating new employment and business opportunities, and encouraging local economic activity.
He said the regional government was also inviting the public to submit written suggestions, opinions and responses to the development plan.
“Public participation can play an important role in ensuring that the Kotanagaya–Boilan road not only improves inter-regional connectivity, but is also built responsibly and sustainably, delivering the greatest possible benefits to people’s welfare,” Darsat said.
Source: jawawa.id (https://jawawa.id/newsitem/buol-regency-prepares-environmental-impact-assessment-for-118-4-kilometre-kotanagaya-boilan-road-1791697880)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5780609/pemkab-buol-susun-amdal-jalan-kotanagaya-boilan-1184-kilometer), translated from Indonesian