Indonesian Political, Business & Finance News

BRIN Intensifies Research into Site Selection and Technology for East Kalimantan Nuclear Power Plant

| Source: Antara (Indonesian) Translated from Indonesian | Energy
BRIN Intensifies Research into Site Selection and Technology for East Kalimantan Nuclear Power Plant
Image: Antara (Indonesian)

Balikpapan (ANTARA) – Indonesia’s National Research and Innovation Agency (BRIN) has emphasised that in-depth studies and research to determine the appropriate location and technology for a nuclear power plant (PLTN) in East Kalimantan are continuing intensively.

BRIN head Professor Arif Satria said in Balikpapan, East Kalimantan, on Saturday that a nuclear power plant in the future had become inevitable amid rapidly growing industrial energy needs and the green transition.

“A nuclear power plant has become inevitable. BRIN is continuing its research into the right type of power generation and which area would be most suitable for developing one,” Arif said.

He said the acceleration of energy research was proceeding alongside preparations for a digital ecosystem and the development of artificial intelligence (AI) expertise at regional universities.

A national energy planning research document identifies at least three potential areas in East Kalimantan for reactor-site studies.

The locations are the coastal area of Sangatta in East Kutai Regency, Samboja in Kutai Kartanegara Regency, and Babulu in North Penajam Paser Regency.

They were selected because they have abundant supplies of cooling water from the sea and relatively stable geological structures, with lower exposure to major earthquakes.

According to national strategic mapping data, East Kalimantan has a geological advantage, with rock formations considered relatively stable against major earthquakes compared with other parts of Indonesia.

Technical studies will therefore examine not only reactor safety, but also calculations of environmental carrying capacity and safe distances from population centres.

“We want to ensure that every stage of this study is conducted transparently and accurately, and involves local universities, so that technological readiness and human resources can develop in tandem,” Arif said.

Plans to use nuclear energy in East Kalimantan date back to the governorship of Awang Faroek Ishak, who served from 2008 to 2018. The nuclear power plant was viewed as a solution to meeting thousands of megawatts of electricity demand in the province, for both households and industry.

The strategic proposal continued under Governor Isran Noor. At the time, technical coordination with the National Nuclear Energy Agency (BATAN) continued to map the region’s suitability and assess long-term safety.

More from 7 November 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/brin-intensifies-research-into-site-selection-and-technology-for-east-kalimantan-nuclear-power-plant-1794048687)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5838603/brin-intensifkan-riset-penentuan-lokasi-dan-teknologi-pltn-kaltim), translated from Indonesian
Print