Indonesian Political, Business & Finance News

BPJN: Enang-enang Bridge in Bener Meriah, Aceh to be built next year

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
BPJN: Enang-enang Bridge in Bener Meriah, Aceh to be built next year
Image: Antara (Indonesian)

The Aceh National Road Implementation Agency (BPJN) has stated that the bridge and roads in the Enang-enang area of Bener Meriah Regency, Aceh, will be permanently constructed in 2027, and an alternative route is currently available for public use.

“The infrastructure in Enang-enang has actually been programmed for 2027,” said the Acting Head of BPJN Aceh, Zulkarnaini, in West Aceh on Monday.

As information, the Enang-enang bridge, which connects Bener Meriah and Bireuen Regencies, has not yet been repaired following the flash floods and landslides in Aceh.

As a result, local residents have begun repairing the bridge and roads independently to ensure they can be traversed, at least for use by two-wheeled vehicles.

“We saw the viral news everywhere regarding the community building the bridge themselves. We from BPJN have met with the Regent of Bener Meriah and the community, and it will be built in 2027,” he said.

Zulkarnaini explained that the community’s alternative of building the bridge themselves stems from their desire to have access to their respective plantations using motorcycles, whereas use by cars is not recommended.

“We asked the community why they wanted to build it themselves; it is because they want faster access than having to take a long detour. While it may be passable for motorcycles, we cannot yet recommend it for four-wheeled vehicles,” he said.

He noted that for access to Bener Meriah and Central Aceh, the government has prepared an alternative route from Enang-enang via the regency road through Wih Porak Village, Pintu Rime Gayo District, which is still in use and has been widened.

“We have also improved that road by widening it on both the left and right sides, increasing the width from four to six metres,” he added.

He further explained that the construction of the Enang-enang bridge is taking longer because the process is more complex, requiring specific technical studies as it is situated on a mountainside slope.

On this occasion, BPJN Aceh urged the public not to use heavy-load vehicles when crossing the Enang-enang bridge. “Because we have no guarantee that the collapsed bridge can be safely traversed,” Zulkarnaini concluded.

More from 15 June 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/bpjn-enang-enang-bridge-in-bener-meriah-aceh-to-be-built-next-year-1781527988)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5609173/bpjn-jembatan-enang-enang-bener-meriah-aceh-dibangun-tahun-depan), translated from Indonesian
Print