Indonesian Political, Business & Finance News

BP BUMN: Sitinjau Lauik Flyover to Improve Connectivity in West Sumatra

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
BP BUMN: Sitinjau Lauik Flyover to Improve Connectivity in West Sumatra
Image: Antara (Indonesian)

For years, West Sumatra has faced frequent disruptions to connectivity at two key locations: Sitinjau Lauik and Silaing in the Anai Valley. Both issues are a focus of President Prabowo’s government, which aims to resolve them.

Padang (ANTARA) - The State-Owned Enterprises Regulatory Agency (BP BUMN) believes that construction of the Sitinjau Lauik flyover, linking the main road from Padang to Solok, will improve connectivity in West Sumatra.

“West Sumatra has faced frequent disruptions to connectivity for years at two key locations, Sitinjau Lauik and Silaing in the Anai Valley. These are two problems that the Prabowo government is focusing on resolving,” BP BUMN head Dony Oskaria said in Padang, West Sumatra, on Tuesday.

He made the remarks during a field visit by BP BUMN and House of Representatives Commission VI to the Sitinjau Lauik flyover construction site.

He said the connectivity problem could be addressed by building the flyover, which would have a significant impact on economic growth in West Sumatra.

He added that West Sumatra residents should also be grateful that construction of the Padang–Bukittinggi toll road is due to resume soon, starting in January 2027.

“The toll road construction will resolve the connectivity problem in the Anai Valley. Once that is completed too, economic growth will improve,” he said.

He urged West Sumatra residents to support the Sitinjau Lauik flyover and the continuation of the Padang–Bukittinggi toll road project.

“Government programmes are geared towards addressing the fundamental problems faced by the public,” he said.

The Sitinjau Lauik flyover is located on the Padang–Solok road in Lubuk Kilangan, Padang, West Sumatra.

The flyover is being built under a public-private partnership scheme, with Hutama Karya as the contractor and an investment value of Rp2.79 trillion.

The project is intended to improve the road’s geometry: the maximum gradient will be reduced from 26 per cent to 8 per cent, while the curve radius will be increased from less than 15 metres to less than 95 metres. Visibility is also expected to improve.

The 53-kilometre Sitinjau Lauik route connects Padang and Solok. It is part of the national road network and the Trans-Sumatra route, which continues towards Dharmasraya, Jambi and Java.

The road is heavily used because it is the shortest route between Solok and Padang. Sitinjau Lauik lies within a protected forest area, where the road has gradients of up to 45 degrees and includes steep climbs and descents, sharp bends, cliffs and ravines.

In light rain, dense fog often obstructs visibility and increases the risk of accidents. The area is prone to accidents and landslides, which have frequently caused property damage and fatalities.

More from 27 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/bp-bumn-sitinjau-lauik-flyover-to-improve-connectivity-in-west-sumatra-1793105667)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5815219/bp-bumn-flyover-sitinjau-lauik-tingkatkan-konektivitas-di-sumbar), translated from Indonesian
Print